My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:54:06 PM
Creation date
11/8/2018 9:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2011 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2011 - 2017
QuestysRecordDate
4/9/2018 3:51:45 PM
QuestysRecordID
3847565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer M Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution:0.002" <br /> UDC#7-8 UDC#9-10 UDC# UDC# <br /> UDC Manufacturer: Bendel Bendel <br /> UDC Material: Fiberglass Fiberglass <br /> 77 <br /> UDC De the 34" 34" <br /> Height from UDC Bottom to Top 12„ 12" <br /> of Highest Pi in Penetration: <br /> Height from UDC Bottom to 14„ 14" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested' 27 Penetrations 2"I Penetrations <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No N NA []Yes ❑No ®NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time NIA NIA <br /> Is system programmed for fail- ❑Yes ❑No E NA ❑Yes [:]No M NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes [-]No ENA ❑Yes ❑No M NA ❑Yes ❑No ❑NA [-]Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min 10 min <br /> startin test <br /> Test Start Time: 11:10am 11:46am <br /> Initial Readin RI): 5.7515" 6.9073" <br /> Test End Time: 11:25am 12:01 pm <br /> Final Readin (RF): 5.7515" 6.9067" <br /> Test Duration: 15min 15min <br /> Chan a in Readin RF-R,): 0.000" -0.0006" <br /> Pass/Fail Threshold or Criteria: +l-0.002" +l-0.002" +l-0.002" +l-0.002" <br /> Test Result: ® Pass ❑ Fail E Pass E] ail ❑ Pass ❑ Fail ❑Pass ❑ Fail <br /> Was sensor removed for testing? E Yes ❑No ❑NA E Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and M Yes ❑No ❑NA M Yes ❑No ❑NA [--]Yes ❑No [INA ❑Yes ❑No ❑NA <br /> verified functional after testing" <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> ENVY` <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.