My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:54:06 PM
Creation date
11/8/2018 9:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2011 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2011 - 2017
QuestysRecordDate
4/9/2018 3:51:45 PM
QuestysRecordID
3847565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:0—15 PSI GAUGES Equipment Resolution. 0.002" <br /> G Piping Run#T-3 Pim Run# <br /> f Piping Run#T-1 87 Piping Run#T-2 91 Diesel Piping <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: A.O.Smith A.O.Smith A.O.Smith <br /> Piping Diameter: 3"over 2" 3"over 2" 3"over 2" <br /> Length of Piping Run: Approx.175' Approx.175' Approx.175' <br /> Product Stored: 87 unleaded 91 supreme Diesel#2 <br /> Method and location of Test Boot @ STP Test Boot @ STP Test Boot @ STP <br /> piping-run isolation: ---- _-� <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min 10 min 10 min <br /> starting test: <br /> Test Start Time: 9:30am 9:30am 9:30am _ <br /> Initial Reading(RT): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 10:30am 10:30am 10:30am _ <br /> Final Reading(RF): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 1 hr 1 hr 1 h r <br /> tPass/Fail <br /> Reading(RF-Rt): 0.0 PSI 0.0 PSI 0.0 PSI <br /> Threshold or NO LOSS NOLOSS NO LOSS NO LOSSult• ®Pass ❑ Fail ®Pass ❑Fail ®Pass ❑Fail ❑Pass ❑Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> lul ( it <br /> -HEA <br /> LTH <br /> :.;,i- <br />
The URL can be used to link to this page
Your browser does not support the video tag.