Laserfiche WebLink
SWRCB,January 2002 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer M Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:INCON SUMP TESTER Equipment Resolution:0.002" <br /> Sump#T-1 87 Sump#T-2 91 Sump#T-3 Diesel Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 59" 58" „ <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 11„ 16" 16" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 17" 26" 26" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 2"/Penetrations 2"/Penetration 2"/Penetrations <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA Elves ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time NIA N/A NIA <br /> Is system programmed for fail-safe El Yes ❑No ®NA Elves []No ®NA Elves ❑No ®NA Elves ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be Elves E]No ®NA Elves ❑No ®NA Elves ONO ®NA [Ives ONO ❑NA <br /> operational')* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 min 10 min 10 min <br /> test: <br /> Test Start Time: 12:12pm 12:12pm 12:33pm <br /> Initial Reading(RI): 6.1221" 5.6567" 6.0325" <br /> Test End Time: 12:27pm 12:27pm 12:48pm <br /> Final Reading(RF): 6.1219" 5.6560" 6.0326" <br /> Test Duration: 15min 15min I Smin <br /> Change in Reading(RF-RI): -0.0002" -0.0007" +0.0001" <br /> Pass/Fail Threshold or Criteria: +/-0.00211 +/-0.002" +1-0.002" +/-0.002" <br /> Test Result: ®Pass ❑Fail ®Pass ❑FaH ®Pass ❑Fait ❑Pass ❑Fail <br /> Was sensor removed for testing? ®Yes E]No El NA ®Yes [--]No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ®Yes ❑No ❑NA ®Yes ❑No ❑NA ®Yes ONO ❑NA Elves ❑No ❑NA <br /> verified functional after testin ? <br /> COMMents—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> H <br /> I If the entire depth of the sump is not tested,specify how much was tested. If the answer to ppy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />