My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:54:06 PM
Creation date
11/8/2018 9:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2011 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2011 - 2017
QuestysRecordDate
4/9/2018 3:51:45 PM
QuestysRecordID
3847565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
er sma"4 <br /> D.Results of Testing/Servicing RE <br /> Software Version Installed: 333.02 <br /> Complete the following checklist: MAY 0 3 2017 <br /> Yes r No* Is the audible alarm operational? ENIVIROW3 _ l <br /> HEALTH <br /> f+ Yes f No* Is the visual alarm operational? PER' _ i <br /> <+ Yes (' No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> C* Yes r No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> heir proper operation? <br /> !+ Yes /" No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> f^ N/A <br /> f* Yes (` No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> N/A system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> all that apply)F Sump/Trench Sensors; r Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?C Yes; f` No <br /> Yes r No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> !` N/A so at what percent of tank capacity does the alarm trigger?90% <br /> r Yes* No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E below. <br /> Yes* l+ No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product r water.If yes,describe causes in Section E below. <br /> Yes f— No* lWas monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> f+ Yes 1(' No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> Monitoring System Certification Page 2 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.