My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_PLAN 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
REMOVAL_PLAN 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:21:15 PM
Creation date
11/8/2018 9:43:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
PLAN 1991
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\REMOVAL PLAN 1991.PDF
QuestysFileName
REMOVAL PLAN 1991
QuestysRecordDate
11/16/2011 8:00:00 AM
QuestysRecordID
178257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Admk <br /> Quality Assurance Services <br /> �F Materials Consulting <br /> Testing Engineers, Inc. <br /> ';ork Request No. SG456 INSPECTION REPORT week Ending 1 ;;1r/,9 <br /> roject No. 51895 Type of Inspection Place of Inspection <br /> roject : 3P Gas Station Soils Jobsite <br /> 1206 March Lane Insoection <br /> Stockton, CA <br /> Date t t <br /> Hours fl <br /> Miles/Zone Zone 4 7ong d _ <br /> n 4 4 <br /> Inspector <br /> M" ?4arcki Mar_ki Marcki <br /> Report: <br /> 11/12/91 <br /> Arrived at jobsite as recuestec. Cbserved backfilling of 18" lifts- o- 3/4" AS at <br /> existing gas tank pit west of West Lane. Observed compaction procedures using <br /> sheeps foot roller. Performed nuclear density test at various iccations and <br /> elevations. See attached sheet for test results. Existing gas tank pit is <br /> approximately 60' x 45' . Inspector was present during all compaction and <br /> backfilling operations. <br /> 11/13/91 <br /> Arrived at the jobsite as reeuested. Observed backfilling and compaction procedures <br /> at existing gas tank pit west of West Lane. Observed 3/4" AS in lifts of 13" an <br /> compacted using vibrating sheeps foot roller drum. Performed field nuclear density <br /> test at various locations and elevations. See attached data sheet. Inspector was <br /> present during all work performed. <br /> 11/14/91 <br /> Arrived at the jobsite as requested. Observed backfilling of existing gas tank pit <br /> using 3/4" AS and compacted with sheeps foot vibrating roller. Performed field <br /> nuclear density test at various locations. See attached data sheet. Inspector was <br /> present during work performed. <br /> 11/15/91 <br /> Arrived at the jobsite as requested. Observed backfilling and compaction procedures <br /> at existing gas tank pit west of West Lane using 3/4" AS and compacted with sheens <br /> foot vibrating roller. Performed nuclear density test at varices locations and <br /> eievaticns. See attached data sheet. Inspector was present during all work <br /> RECEIVED <br /> NOV 2 7 1991 <br /> PARADISO <br /> CONSTRUCTION CO. <br /> 3830 Business Drive.Suite#112•Sacramento.California 95820•(916)454-4441 <br /> OAKLAND• DIABLO VALLEY•SANTA CLARA• MONTEREY• SACRAMENTO <br />
The URL can be used to link to this page
Your browser does not support the video tag.