Laserfiche WebLink
Admk <br /> Quality Assurance Services <br /> �F Materials Consulting <br /> Testing Engineers, Inc. <br /> ';ork Request No. SG456 INSPECTION REPORT week Ending 1 ;;1r/,9 <br /> roject No. 51895 Type of Inspection Place of Inspection <br /> roject : 3P Gas Station Soils Jobsite <br /> 1206 March Lane Insoection <br /> Stockton, CA <br /> Date t t <br /> Hours fl <br /> Miles/Zone Zone 4 7ong d _ <br /> n 4 4 <br /> Inspector <br /> M" ?4arcki Mar_ki Marcki <br /> Report: <br /> 11/12/91 <br /> Arrived at jobsite as recuestec. Cbserved backfilling of 18" lifts- o- 3/4" AS at <br /> existing gas tank pit west of West Lane. Observed compaction procedures using <br /> sheeps foot roller. Performed nuclear density test at various iccations and <br /> elevations. See attached sheet for test results. Existing gas tank pit is <br /> approximately 60' x 45' . Inspector was present during all compaction and <br /> backfilling operations. <br /> 11/13/91 <br /> Arrived at the jobsite as reeuested. Observed backfilling and compaction procedures <br /> at existing gas tank pit west of West Lane. Observed 3/4" AS in lifts of 13" an <br /> compacted using vibrating sheeps foot roller drum. Performed field nuclear density <br /> test at various locations and elevations. See attached data sheet. Inspector was <br /> present during all work performed. <br /> 11/14/91 <br /> Arrived at the jobsite as requested. Observed backfilling of existing gas tank pit <br /> using 3/4" AS and compacted with sheeps foot vibrating roller. Performed field <br /> nuclear density test at various locations. See attached data sheet. Inspector was <br /> present during work performed. <br /> 11/15/91 <br /> Arrived at the jobsite as requested. Observed backfilling and compaction procedures <br /> at existing gas tank pit west of West Lane using 3/4" AS and compacted with sheens <br /> foot vibrating roller. Performed nuclear density test at varices locations and <br /> eievaticns. See attached data sheet. Inspector was present during all work <br /> RECEIVED <br /> NOV 2 7 1991 <br /> PARADISO <br /> CONSTRUCTION CO. <br /> 3830 Business Drive.Suite#112•Sacramento.California 95820•(916)454-4441 <br /> OAKLAND• DIABLO VALLEY•SANTA CLARA• MONTEREY• SACRAMENTO <br />