Laserfiche WebLink
BP Gas Station <br /> Page 2 <br /> 11/15/91 <br /> procedures. Existing pit has now been backfilled and compacted to approximately -2' <br /> below sidewalk west of West Lane. <br /> Reviewed by��2/c�,.cJ <br /> William H. Maynara <br /> Operations Manager <br /> cc: Paradiso Construction Co. <br /> /3 <br /> Testing Engineers, Inc. <br /> Quality Assurance Services <br /> Materials Consulting <br />