Laserfiche WebLink
A B C D E F <br /> I <br /> SOI N17 FUEL <br /> f1�1S ALLATIQI SPECIFICATIONS <br /> I, CsE1�l�RAL: _ <br /> E. DOLE, SfZE, 5URIAL DFTN AND COVER: �, ,ANCHORING: ! <br /> A. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND <br /> I. HOLE DEPTH MUST BE DEEP ENOUGH TO ALLOW A MINIMUM OF 12' a. TANKS MUST BE ANCHORED WITH DEADMEN ANCHORS ON ALL WET HOLE <br /> INSTALLATION OF THE UNDERGROUND STORAGE TANKS AND SHALL INSURE THAT <br /> BACKFILL BED OVER THE HOLE BOTTOM. TANKS SHOULD HAVE A INSTALLATIONS. THE WEIGHT OF BACKFILL ABOVE THE DEADMEN <br /> GOOD WoR<MANSHIP, PRACTICES, AND G0N5TRUCTION PROCEDURES ARE MINIMUM COVER DEPTH OF 5'-0' BELOW YARD GRADE WHICH ON EACH SIDE OF A TANK TO WHICH THEY ARE ANCHOREC <br /> FOLLOWED DURING THE HANDLING AND INSTALLATION OF THE TANKS, REGARDLESS INCLUDES A 6' MINIMUM REINFORCED CONCRETE PAD. REFER TO PROVIDES THE ADDITIONAL HOLD DOWN FORCE REQUIRED <br /> 1551ON OF ANY APPLICABLE SUGGESTION IN THESE DRAWING B-3 FOR CONCRETE SLAB DETAILS. <br /> OF THE INCLUSION OR OI`1 TO PREVENT FLOAT-OUT UNDER THE MOST ADVERSE CONDITIONS <br /> IN5TRUCTIONS. AFOR TANKS BURIED A MINIMUM OF 5 FT, BELOW YARD <br /> 2. PD DIMENSION$:_ GRADE. INSTALLATION OF DEADMEN SHALL BE PER DEADMEN <br /> B. UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE INSTRUCTIONSANCHOR DETAIL ON DWG. J-6. <br /> E C4 <br /> ARE THE RESPONSIBILITY OF THONTRACTOR. MANUFACTURER'S SPECIALISTS REINFORCED CONCRETE PAVING MUST EXTEND AT LEAST I' ONTO <br /> ARE AVAILABLE FOR CONSULTATION. THE PRESENCE OFA MANUFACTURER OR NATIVE SOIL IN ALL DIRECTIONS AS A SINGLE SLAB. b. CONCRETE SADDLE FORM OF ANCHORINCs DOUBLE WALL STEEL <br /> TANKS IS NOT AOVED AND SHALL NOT BE ACCEPTED FOR <br /> OBSERVER At AN INSTALLATION SITE DOES NOT RELIEVE THE CONTRACTOR PPR <br /> 3. MINIMUM s MAXIMUM BURIALpEPT-I: ANY INSTALLATION <br /> OF THIS RESPONSIBILITY FOR PROPER INSTALLATION OF THE TANK <br /> G. QUESTIONS REGARpING INSTALLATION PROCEDURES OR TANK REPAIRS SHOULD BE MINIMUM BURIAL DEPTH TO FINISH GRADE SHALL NOT BE LESS THARIL-V 6. HOLD DOWN STRAPS: <br /> DIRECTED t0 UNOCAL's REPRESENTATIVE. DEPTH OF COVER FOR TANKS OF 10' OR LESS IN DIAMETER MUST NOT <br /> EXCEED I' OVER TANK TOP. USE PREFORMED STEEL HOLD DOWN STRAPS WITH THREADED ANCHOR, <br /> RODS AND NUTS AS FURNISHED BY TANK MANUFACTURER DEADMEN ANCHOR <br /> D. UNDERGROUND TANKS MUST BE INSTALLED ACCORDING TO THESE INST :UCTION5 POINTS SHALL BE LOCATED PER TANK MANUFACTURER'S SPECIFICATIONS. <br /> AND NFPA 30 AND 30A. LOCAL CODES MAY APPLY AND SHOULD BE CONSULTED. F. <br /> FAILURE TO FOLLOW THESE INSTRUCTIONS WILL VOID THE WARRANTY AND MAY INSTALATION PROCEDURE - DRQ" NOS :_ FOR DETAILS, SEE DRAWING J-6. ALL MATERIALS SHALL BE HOT - DIPPED <br /> RESULT IN TANK FAILURE. PROPER INSTALLATION OF UNDERSROUND TANKS HELPS GALVANIZED. <br /> TO PREVENT TANK DAMAGE AND TO INSURE LONG-TERM CORROSION-PROOF 1. FOLLOWING PROCEDURE SHOULD GOVERN IF HOLE 15 DRY AND HIGH <br /> SERVICE. IT IS IMPERATIVE TO READ, UNDERSTAND, AND FOLLOW THE INSTRUCTIONS WATER TABLE IS NOT ANTICIPATED. IF FUTURE HIGH WATER CONDITIONS S. F34GiCFIL1-I1�CS: <br /> ARE EXPECTED, INSTALLATION SHOULD BE MADE IN ACCORDANCE WITH WET <br /> BELOW. HOLE PROCEDURE. THE UNOCAL REPRESENTATIVE SHALL DETERMINE THE PROCEDURE eACKFILLING PROCEDURE WILL BE THE SAME AS OUTLINED FOR A DRY HOLE <br /> E. UNDERGROUND TANKS REQUIRE THE BACKFILL MATERIAL TO PROVIDE A3 MUCH AS (WET OR DRY) TO BE USED. INS-ALLATION. <br /> W% OF THE TANK SUPPORT UNDER CERTAIN STRESS CONDITIONS. THE INSTALLING <br /> CONTRACTOR MUST BE POSITIVE HE HAS THE CORRECT BED AND BACKFILL AND 2. Fj .TER FABRIC INSTALLATION - UNDER s AROUND TA CWPEN REQUIRED) <br /> FOLLOWS THESE INSTRUCTIONS EXACTLY. <br /> a, AFTER TANK EXCAVATION HAS BEEN COMPLETED TO PROPER SIZE, THE }�. INT SIAL PIPINC4 AND PUM <br /> HOLE WILL BE LINED WITH A FILTER FABRIC MATERIAL INSTALLED IN <br /> 11. TAW WQ S . ACCORDANCE WITH MANUFACTURERS RECOMMENDA T iONS. FILTER FABRIC 1, THE CLEARANCES FROM THE TOP OF FITTINGS TO TANK BOTTOM MUST BE <br /> SHALL CONFORI-1 TO THE FOLLOWING: MEASURED TO INSURE THAT ADEQUATE CLEARANCES ARE MAINTAINED FOR <br /> A. HANDLING_ DUPONT "TYPAR" STYLE 3401 - 4 OZ. / SQ. YD, REMOTE PUMP, FILL TUBE, OR ANY OTHER INTERNAL PIPING INSTALLED. <br /> 1. CHOCK TA HOECHST 'tREvIRA' STYLE 1114 - 4 OZ. / SQ. YD. 2. THE PUMP AND ATTACHED PIPINGS MUST BE FREE TO MOVE WITH THE TANK <br /> TANK.$ SHOULD NOT BE DROPPED, ROLLED, OR IMPACTED. CHOCK J. FILLING TANKS <br /> THE TANKS UNTIL READY FOR INSTALLATION AND TIE THEM DOWN IF In. FILTER FABRIC SHALL BE OVERLAPPED 2' MIN. AT ALL JOINTS. FOLD OVER <br /> HIGH WINDS ARE EXPECTED. USE MINIMUM 1/2' DIAMETER NYLON AT TOP OF EXCAVATION WHEN BACKFILLING 15 COMPLETE. <br /> DO NOT FELL TANKS UNTIL BACKFILL IS TO TOP 01= TANK. NEVER ADD PRODUCT OR <br /> OR HEMP ROPE OVER EACH TANK AND TIE TO WOODEN STAKES OF <br /> ADEQUATE SfZE TO PREVENT TANKS FROM BEINGS MOVED BY HIGH c. FILTER FABRIC LINER WILL BE REQUIRED ONLY WHEN ACTUAL SOIL CONDITIONS WATER FOR HOLD DOWN N DRY OR WET HOLE CONDITIONS UNTIL BAGKFILLINCS IS <br /> WINDS. WARRANT. LOOSE, POORLY GRADED OR SILTY SAND SOIL WILL NORMALLY COMPLETED. <br /> REQUIRE FILTER FABRIC. THE UNOCAL REPRESENTATIVE SHALL DETERMINE K_ ,d,Dp111--n TANKS TO EXISTING INSTALLATIONS <br /> 2. LIFTIWj TANK.$: WHEN LINER 18 TO BE INSTALLED. CONTRACTOR TO PROVIDE SEPERATE <br /> LINE ITEM 4 COST IN BID FOR INSTALLATION OF FILTER FABRIC LINER. 1. TANKS CAN BE ADDED TO EXISTING INSTALLATIONS. IT 15 IMPORTANT TO <br /> 2 USE INSTALLATION LIFT LUG(S) TO LIFT TANK. LARGER TANKS HAVE REMEMBER THAT DOUBLE WALL STEEL TANKS REQUIRE GOOD <br /> FOUNDATION 2 <br /> MULTIPLE LIFTS LUGS-- ALL MUST BE USED. GUIDE THE TANK WITH 3. BEF <br /> D: SUPPORT ROM SURROUNDING D N <br /> 601L AND ARE SELF-SUPPORT G <br /> GUIDELINES. DO NOT USE CHAINS OR GABLES AROUND TANKS. IF <br /> TANKS HAVE TO BE MOVED, (DO NOT ROLL), SET ON SMOOTH PROVIDE A MINIMUM 12' THICK PEA GRAVEL BED AT BCTOM OF UNDER FUEL OR OYER-BURDEN LOADS. THE FOLLOWING GUIDES ARE <br /> SUGGESTIONS TO REDUCE LOADS FROM SOIL OR PRODUCT ON UNCOVERED <br /> GROUND, FREE OF ROCKS AND FOREIGN OBJECTS AND RECHOCK TANK HOLE. PEA GRAVEL BED MUST BE GRADED SMOOTH AND TANKS 50 NO DAMAGE WILL OCCUR FINAL SELECTION OF METHOD IS THE <br /> CAPACITY OF LIFTINGS EQUIPMENT MUST BE CHECKED BEFORE LEVEL TO RECEIVE TANKS. CAREFULLY PLACE TANKS ON PEA RESPONSIBILITY OF UNOCAL'S REPRESENTATIVE DEPENDING ON LOCAL SITE <br /> MOVING TANKS. GRAVEL BED. CONDITIONS. <br /> B_ TESTING: <br /> 4. BACKFILLING: 2. ISOLATED BURY (PREFERRED) <br /> 1. TANKS WILL ARRIVE ON SITE WITH 5 PSI PRESSURE IN THE TANK USE EXTREME CARE IN BACKFILLING BENEATH TANK BOTTOM TO INSTALL TANKS IN SEPARATE HOLE WHIC14 15 A MINIMUM OF 3' FROM EDGE <br /> INTRODUCED AT THE FACTORY, BY THE MANUFACTURER. PROVIDE A SOLID SUPPORT FREE OF VOIDS. A WOODEN BOARD OR OF ORIGINAL TANK INSTALLATION HOLE. UNDISTURBED SOIL BETWEEN NEW <br /> CONTRACTOR TO LEAVE PRESSURE ON UNTIL TANKS ARE BACK 51MILAR DEVICE SHOULD BE USED TO PUSH THE BACKFILL UNDER EXCAVATION AND ORIGINAL HOLE MUST BE MAINTAINED. KEEP SURFACE <br /> FILLED. iF PRESSURE LOSS 15 DETECTED, CONTACT UNOCAL AND THE TANK SINGE PEA GRAVEL WILL NOT FLOW INTO THIS AREA. LOADS OFF EXISTING TANKS. <br /> TANK MANUFACTURER IMMEDIATELY. IT IS EXTREMELY IMPORTANT THAT THE UTMOST CARE BE EXERCISED <br /> IN THE BACKFILLING OF THE TANKS, AS TANK FAILURES HAVE RESULTED <br /> 2. WHILE TANK 15 UNDER PRESSURE, ALL FITTINGS, SEAMS, OVERLAYS OR ANY WHERE VOIDS WERE EVIDENT UNDER THE TANK GOOD COMPACTION AND 3. BURL' IN SAME DOLE (ALTERNATEI <br /> OTHER SUSPECT AREAS SHOULD BE WETTED WITH A 'SOAPY' SOLUTION TO 5UPPORT FOR THE TANK CAN BE OBTAINED BY 5HAPING THE GRAVEL WITH <br /> INSPECT FOR MINOR LEAKS WHICH OTHERWISE MIGHT NOT BE EVIDENT. A A SHOVEL ALL AROUND THE PERIMETER OF EACH TANK COMPLETE BACKFILLING s. LOWER PRODUCT LEVEL IN EXISTING TANKS TO LESS THAN 1/4 TANK <br /> GARDEN TANK-TYPE SPRAYER WITH 'SEAM TEST SOLUTION' MANUFACTURED WITH PEA GRAVEL TO WITHN APPROX. 1/2' OF CONCRETE SLAB SUB-GRADE CAPACITY. <br /> BY WINTON PRODUCT S, CHARLOTTE, N.C_, 15 RECOMMENDED FOR THIS ELEVATION. GRADE SMOOTH b. REMOVE SURFACE PAD, iF ONE EXISTS, TO LOWER BAC FILL. <br /> PURPOSE. AN ALTERNATE ACCEPTABLE SOLUTION WOULD BE ONE (1) CUP c. EXCAVATE FOR NEW TANKS, LEAVING; AS MUCH BACKFILL AS <br /> OF DISHWASHING DETERGENT SUCH AS DOVE OR IVORY LIQUID IN A G. JNSTALLATION PROCEDURE - LVET NOLO: POSSIBLE AROUND EXISTING TANKS. <br /> GALLON OF WATER <br /> d. PROTECT EXCAVATION AGAINST CAVING IN. SEE <br /> FOLLOWING PROCEDURE Si-TALL APPLY WHERE WATER TABLE 15 16 Ft. C. DURING INSTALLATION, EXISTING TANKS MUST NOT BE ALLOWED TO <br /> 3. IF TANKS ARE DROPPED OR IMPACTED AFTER INITIAL TEST, RETEST TANKS OR LESS BELOW THE 5UIRFACE OR WHERE A FUTURE WATER CONDITION MOVE. SHORING MAY BE REQUIRED TO RETAIN BACKFILL. <br /> AND SOAP AREAS OF IMPACT TO CHECK FOR TANK DAMAGE. IF DAMAGE 15 ANTICIPATED. F. INSTALL NEW TANKS AS DESCRIBED EARLIER IN THESE <br /> HAS OCCURRED, DO NOT ATTEMPT REPAIRS. CONTACT UNOCAL's INSTRUCTIONS, LEAVING A MINIMUI"I OF 24' BETWEEN NEW TANKS <br /> REPRESENTATIVE. 1, 'WATER LEVEL AND EXISTING TANKS_ <br /> 4. HOLIDAY TEST SHALL BE PERFORMED BY TANK MANUFACTURER PRIOR TO WATER LEVEL SHOULD BE MAINTAINED AT THE LOWEST PRACTICAL LEVEL <br /> SETTING OF TANK DURING INSTALLATION. A SUMP AND PUMP ORA SYSTEM OF WELL POINTS <br /> AND PUMPS IS THE RECOMMENDED METHOD TO MINIMIZE WATER LEVEL IN <br /> THE HOLE. THE TYPE OF SYSTEM REQUIRED WILL DEPEND ON WATER FLOW <br /> G. 5EP —AND 5-4c;<E11MATERIAL: RATE INTO THE HOLE. THE HOLE BOTTOM SHOULD BE LEVEL, FREE OF <br /> ROCKS AND DEBRIS_ <br /> 1, GRAVEL NOTE: UNOCAL ENVIRONMENTAL ENGINEER SHALL BE NOTIFIED PRIOR TO PUMPING <br /> BED AND BACKFILLING MATERIAL SHALL BE OF GLEAN PEA GRAVEL. ANY OCHER <br /> OUT ANY WATER THIS WATER MAY BE CONTAMINATED AND MAY REQUIRE ANALYSIS RECEIVED <br /> EQUIVALENT MATERIAL MUST BE APPROVED BY UNOCAL'S REPRESENTATIVE. A PRIOR TO DISPOSAL. # <br /> NATURALLY-ROUNDED AGGREGATE, CLEAN AND FREE FLOWING, WITH PARTICLE SIZE �C ` 1 �� � <br /> 3 NOT LESS THAN 1/8' OR MORE THAN 3/8' IN DIAMETER WITH NO MORE THAN 3 q. PASSING 2. SHORfNCS <br /> THROUGH A NO. 8 SIEVE. USE THIS DESCRIPTION WHEN SPECIFYING OR ORDERING �NV�� � � vi � <br /> HROUG A <br /> BECAUSE MATERIAL 15 KNOWN BY DIFFERENT NAMES IN DIFFERENT AREAS. THIS LL WET HOLE INSTALLATIONS WILL REQUIRE THE INSTALLATION OF AN <br /> MATERIAL IS COM1`10NLY-CALLED PEA GRAVEL. ENGINEERED SHORING SYSTEM. <br /> D. XCAVATION: FI F IG NST ATION - 4 A TANKS <br /> a. AFTER TANK EXCAVATION HAS BEEN COMPLETED TO PROPER SIZE, THE <br /> I_ SAFETY HOLE WILL BE LINED WITH A FILTER FABRIC MATERIAL INSTALLED IN <br /> a. CONTRACTOR SHALL GONFORr'I WITH 'CONSTk"l�CTION SAFETY ORDER', DIVISION ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. FILTER FABRIC <br /> SHALL CONFORM TO THE FOLLOWING: <br /> OF INDUSTRIAL SAFETY, CALIFORNIA CODE OF REGULATIONS, TITLE 8, SUBCHAPTER 4, <br /> ARTICLE 6, SECTION 1540 AND 1541 AND GAL-OSHA NO- 415-150 COR FEDERAL DUPONT 'TYPAR' STYLE 3401 - 4 OZ. / SQ. YD, <br /> REQUIREMENTS AT STATIONS OUTSIDE OF CALIFORNIA) <br /> HOECHST 'TREYIRA' STYLE 1114 - 4 DL <br /> b. WORKERS, MATERIALS AND EQUIPMENT IN THE VICINITY OF THE EXCAVATED <br /> AREAS SHALL BE PROTECTED AT ALL TIMES. b. FILTER FABRIC SHALL BE OVERLAPPED 2' MIN. AT ALL JOINTS. FOLD OVER <br /> AT TOP OF EXCAVATION WHEN BACKFILLING IS COMPLETE. <br /> 2. .$TABLE_.WALLS <br /> THOSE WHICH NORMALLY CAN BE MADE VERTICAL FROM BED TO GRADE <br /> 4, QED <br /> WITHOUT USE OF SHORING OR SHEET PILING. HOLE EXCAVATION MUST <br /> BE LARGE ENOUGH TO ALLOW A MINIMUM OF �4' BETWEEN TANKS AND AFTER THE BOTTOM OF TANK HOLE HAS BEEN LEVELED AND GRADED FREE <br /> A MINIMUM OF 74' FROM ENDS AND SIDES OF TAN" t0 HOLE WALLS. OF ROCKS, A 12' MINIMUM THICK LEVEL BACKFILL OF PEA GRAVEL WILL BE <br /> INSTALLED ON THE BOTTOM OF TANK HOLE. <br /> 3. TA W 5. BALLAST: <br /> THOSE WITH SOILS HAVING LESS THAN 150 LBS / SQ_ FT. COHE51ON PLACE TANKS IN HOLE AND BACKFILL. DO NOT ADD PRODUCT OR WATER <br /> AS CALCULATED FROM AN UNCONFINED COMPRESSION TEST, OR TO THE TANK, UNLESS AUTHORIZED BY THE LOCAL AGENCIES AND THE <br /> SOILS WITH AN ULTIMATE BEARING CAPACITY OF LESS THAN 3, 500 UNOCAL ENGINEER UNDER SPECIAL CIRCUMSTANCES. UNOCAL ENGINEER <br /> L56 / SQ. FT, HOLE MUST BE LARGE ENOUGH TO ALLOW MINIMUM OF SHALL DETERMINE THE METHOD TO USE. <br /> 1/2 THE TANK DIAMETER FROM ENDS AND 51DE5 OF TANKS TO HOLE <br /> WALLS. A QUALIFIED SOIL TESTING LABORATORY CAN PROVIDE DATA 6, CAJJTICN DO NOT PLACE TANKS ON TIMBERS, BEAMS OR CRADLES. <br /> AND RECOMMENDATIONS. IF THERE ARE ANY QUESTIONS CONCERNING SAFETY, <br /> CONTACT UNOCAL'S REPRESENTATIVE FOR REVIEW OF SOIL CONDITIONS <br /> WHICH MAY REQUIRE SHORING. <br /> DESTROY ALL PRINTS REV. CKD. APP'D - APPROVAL RECORD <br /> REV DATE REVISED BEARING MUER DATE gr ffr aY APPROVALS <br /> © UNION OIL OF CALIFORNIA, dba UNOCAL, 1994 — �,�aN> -- �„� APPROVAL °�` I TART <br /> DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS _ __ Ii —I UNDERGROUND FUEL TANK INSTALLATION <br /> ISSUED FOR C.U.P. <br /> THIS DO i ! cNECKED ar WD I <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS ISSUED FOR PLAN CHECK (REGIONAL ��ING ) DATE SPECIFICATIONS <br /> SPECIFICATIONS <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE <br /> _ - -- APPROVED <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL __ j -�— <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE — - ISSUED FOR GEN. BID ----- <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT _ �— �,� 2-$--gS ��'"� �"� '�^""�°�) °"� �DaAwx,tc No. ,REV No. — <br /> - -- ^� __ ISSUED FOR CONSTRUCT. I 5H> <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL UNOCAL* J - 0 .NONE1OF <br /> IN WRITING. - I RECORD DRAWING c� N � <br /> D E I OWN K:\UN\UN1682\JDWGS\STE <br /> A B C 7 <br />