Laserfiche WebLink
B C D E F <br /> I_ 1�t ►L PIPING C1FICATIONS 11. 1"ON11291NCa SYSTEM IV. <br /> A. MATERIAL CONTRACTOR SHALL INSTALL MONITORING SYSTEM. OWNER A. PETROLEUM PRODUCTS FOR TESTING EQUIPMENT G. FINAL 51'5Tr=M_PRECISI0N TEST <br /> SHALL SUPPLY APPROVED MONITORING SYSTEM. <br /> 1- 48 HOURS BEFORE THE CONTRACTOR REQU#RES 1. THE TANK AND PIPING SYSTEMS MUST PASS A FULL <br /> CONTRACTOR SHALL NOT DEVIATE FROM MATERIALS OR III. IFI ( DELIVERY OF PETROLEUM PRODUCTS FOR SYSTEM PRECISION TEST PURSUANT TO SECTION <br /> PRODUCTS SPECIFIED UNLESS THROUGH MUTUAL TESTING EQUIPMENT, HE SHALL REQUEST THE 2643, SUB SECTION (b) OF THE CALIFORNIA CODE <br /> AGREEMENT WITH OWNER'S REPRESENTATIVE- A. MATERIAL SUPPL IED RC 'S RE <br /> 3Y CONTATOg OWNERS TO ARRANGE FOR IT. OF REGULATIONS, TITLE 23, PRIOR t0 FINAL APPROVAL. <br /> 1 SUBSTITUTE MATERIALS SHALL BE DESCRIBED, IMMEDIATELY AFTER THE DELIVERY, CONTRACTOR UNOCAL WILL ARRANGE FOR THIS TEST. CONTRACTOR 1 <br /> SPECIFYING ANY DIFFERENCE IN COST. ONLY NEW 1- THE CONTRACTOR SHALL PURCHASE AND INSTALL AND OWNER'S REPRESENTATIVE SHALL TOGETHER TO COORDINATE SCHEDULING WITH UNOCAL. PROVIDE <br /> MATERIALS SHALL BE USED. ALL MATERIALS. ALL MATERIAL SHALL BE NEW ACCURATELY GAUGE THE PETROLEUM PRODUCT ALL TEST RESULTS TO UNOCAL AND LOCAL AGENCY <br /> B. TAMC FI A�25EM5LY AND FIRST QUALITY AND SHALL BE LISTED BY A WITH A GAUGE STICK AND RECORD THE DELIVERED INSPECTORS AS REQUIRED. <br /> NATIONALLY RECOGNIZED TESTING LAB. QUANTITY OF PRODUCT. <br /> THE CONTRACTOR SHALL ATTACH TO THE TAG LUG IN g. WIRES ,AND CAE3LES 2. UPON COMPLETION AND ACCEPTANCE OF 2. TEST FLUID FOR PRODUCT 'TANKS TO BE THE DESIGNATED <br /> EACH TANK FILL BOX A METAL COMMODITY TAG (BRAND <br /> CONSTRUCTION WORK BY THE OWNER'S PRODUCT FOR THE SPECIFIC TANK <br /> NAME OF PETROLEUM PRODUCT CONTAINED) AND A 1. WIRING INSIDE BUILDING AND ABOVE GROUND <br /> REPRESENTATIVE, THE CONTRACTOR SHALL <br /> METAL CAPACITY TAG. SHALL BE TYPE THWN- WIRING IN CONDUIT REPEAT THE AFORE DESCRIBED GAUGING 3. IF AN UNDERGROUND WASTE OIL TANK 15 TO BE INSTALLED, <br /> UNDERGROUND OR IN DAMP LOCATIONS SHALL BE PROCEDURE AND RECORD FOR COMPARISON THE TEST FLUID IS t0 BE WATER CONTRACTOR TO FILL TANK <br /> G. PIPING TYPE THWy THE MINIMUM SIZE CONDUCTOR SHALL WITH THE FIRST GAUGES. TO TOP OF FILL TUBE= 'N PREPARATION FOR TESTING. <br /> L PIPE WORK OVER TANKS OR UNDER BUILDING BE NO. 12 GAUGE AND MAY BE STRANDED OR <br /> FLOORS SHALL BE AVOIDED. PEPS UNDER SOLID, NO. 6 GAUGE AND LARGER SHALL BE B. TESTING UNDERD GROUNFUEL TANKS <br /> CONCRETE SLABS SHALL BE LIMITED TO THE STRANDED. 4. RV 5TTETORRTO BE PRESENT DURING TESTS TO <br /> 1, TEST TO BE PERFORMED PER DRAWING J-0. 1 <br /> MINIMUM REQUIRED t0 REACH DISPENSERS. 2. ALL CONDUCTORS SHALL BE COPPER. <br /> STREET ELLS AND THREAD NIPPLES SHALL NOT BE G. TESTING GASOLINE E!lPE SYSTEMS `� UPON SUCCESSFUL COMPLETION OF TANK TEST, THE <br /> USED. PIPELINES SHALL BE PLACED IN STRAIGHT 3. RACEWAYS SHALL BE COMPLETE AND CONTRACTOR SHALL PUMP OUT ALL WATER FROM THE WASTE <br /> NS, USIPIPE FITTINGS AS REQUIRED. PERMANENTLY IN PLACE BEFORE INSTALLATION <br /> P[PELINES SHALL BE BURIED A MINIMUM OF 18' BELOW OF CONDUCTORS. !. OWNER'S REPRESENTATIVE SHALL BE NOTIFIED 24 Of TAMC AND LEGALLY DISPOSE OF IT. <br /> RNG <br /> FINISHED YARD GRADE. ALL PIPING SHALL BE GRADED HOURS IN ADVANCE OF LEST. <br /> UNIFORMLY UPWARD FROM TANKS AT 1/4' PER 4. CONDUCTORS SHALL BE CLEAN WHEN INSTALLED. 2. EACH PIPE SYSTEM, PRODUCT PIPING, VAPOR <br /> LINEAR FOOT MINIMUM, WITHOUT TRAPS, THUS ALL CONDUCTORS SHALL BE CONTINUOUS AND RETURN PIPING, AND VENT PIPENCs, SHALL BE AIR <br /> PERMITT€NG LIQUID TO DRAIN INTO TANKS. W€TROUT SPLICES BETWEEN JUNCTION BOXES. FIRggURIZED TO 15 P.S.I. AND MAINTAINED AT THAT <br /> TANK VENT RISERS PLACED AGAINST EXTERIOR WALL WHERE SPLICES ARE MADE, THE INSULATION PRESSURE FOR 30 MINUTES BEFORE BA <FILLING. <br /> OF BUILDING SHALL BE SPACED AS SHOWN ON COLOR OF EACH ELECTRICAL CIRCUIT SHALL BE MAINTAIN PRESSURE DURING BACKFILLING AND UNTIL <br /> DWG. J-1.1 AND SECURELY ATTACHED t0 WALL- CONTINUOUS THROUGH ITS LENGTH_ ALE_ BAC.IGFILLING IS COMPLETE. A SOAP SOLUTION <br /> TANK VENC RISERS AT BUILDING SHALL TERMINATE <br /> A MIN. OF 1'-6' ABOVE PARAPET OR EAVE (WITH PRES- 5. WIRINGS DIAGR:Nl - FOR TYPICAL WIRING (TO BE USED AS SHALL BE APPLIED TO ALL FITTINGS DURING TEST <br /> SURE RELIEF VALVE IF REQUIRED) GUIDELINE ONLY) SEE DLL*. J-�. BEFORE BAC<FILLING. IF NO PERCEPTIBLE CHANGE <br /> IN PRESSURE HAS OCCURED AT THE END OF THE <br /> 2. SPECIAL CARE SHALL BE TAKEN TO PREVENT THE C. CONDUIT TEST PERIOD, THE SYSTEM SHALL BE CONSIDERED <br /> INTERMIXING OF STONES, DIRT CLODS, OR OTHER INITIALLY ACCEPTABLE. CONTRACTOR SHALL <br /> DEBRIS WITH THE CLEAN BACKFILL AROUND THE I. CONDUIT RUNS COMPLETE TESTS AT THE TIME DESIGNATED. <br /> PIPE, OR FLEX CONNECTORS. <br /> a. ALL EXPOSED CONDUIT SHALL BE <br /> D, METAL I 4ND FITTINGS CIFIGATIQN INSTALLED STRAIGHT AND TRUE WITH 3. VAPOR BLOCKAGE TEST ON THE VAPOR RECOVERY <br /> REFERENCE TO THE ADJACENT WORK, PIPING fs REQUIRED WITHIN 30 DAYS (OR AS REQUIRED <br /> 1- METAL PIPE WHEN A NUMBER OF ADJACENT CONDUITS BY THE LOCAL AIR QUALITY AGENCY) AFTER OPENING <br /> RUN IN THE SAME DIRECTION, THEY SMALL SITE. FORWARD ALL TEST RESULTS TO THE APPROPRIATE <br /> I ALL STEEL PIPINGS, INCLUDING TANK RISERS, SHALL RUN PARALLEL. LOCAL AGENCY(S) AND UNOCAL- <br /> BE BLACK IRON PIPE (EITHER ASTM A 53 OR <br /> I 2 OR ASTM A 120), MINIMUM SCHEDULE 40, WELDED b. ALL CONDUIT RUNS SHALL BE INSTALLED <br /> 1 OR SEAMLESS. SO AS TO AVOID PIPfNCs. CONDUITS SHALL 4. PERCEPTIBLE WATER IN TANKS AND CONTAINMENT <br /> BE INSTALLED SO THAT THERE SHALL NOT AREAS SHALL BE REMOVED BY THE CONTRACTOR. <br /> NOTE; STEEL PIPE AND FITTING=S WILL BE BE LESS THAN 12' CLEARANCE TO PIPING <br /> USED ONLY WHERE SPECIFICALLY EXCEPT AT CROSSING WHERE THE SPACE 5. ON DOUBLE WALL PEPS, THE SECONDARY P€PE IS <br /> CALLED FOR ON PLANS. ALL WILL BE AS GREAT AS THE CONSTRUCTION TO BE PRESSURE TESTED AT 5 P.S.E. MAX. FOR 30 <br /> OTHER PETROLEUM PIPING, WILL PERMIT. WHERE CONDUITS CROSS PIPINCs, MINUTES, BEFORE BACKFILLING, AND 30 M{NUTES <br /> FITTINCsS AND ADHE51VE SHALL BE THE CONDUIT 15 TO BE INSTALLED UNDERNEATH AFTER BACKFILLING. MAINTAIN PRESSURE UNTIL ALL <br /> ' AMERON OR ISD THREAD EIA WITH THE PiPIW-ar <br /> BACKFILLING iS COMPLETED. <br /> UNDERWRITERS LABEL AND c. REFER TO GONSTRUCtfON DRAWINCsS FOR <br /> METHANOL COMPATIBLE- MINIMUM SIZE OF CONDUITS, OTHERWISE, D. GASOLINE D 1SPENSERS <br /> 2. METAL FITTINGS MINIMUM 5,lZE SHALL BE 3/4' DIAMETER <br /> ALL SCREWED FITTINGS SHALL BE 3001-5. MALLEABLE d_ FITTINGS SHALL BE CONSISTENT AND COMPATIBLE 1. AS SPECIFIED ON GENERAL ARRANGEMENT <br /> IRON PER SPECIFICATION ASTM A 191 AND DIMENSIONAL WITH RELATED RACEWAY MATERIAL. EMT DR,AWENG, CONTRACTOR SHALL LEVEL AND <br /> STANDARD ASA B 16-20, BLACK IRON FITTINGS SHALL CONNECTORS SHALL BE PRESSURE GLAND TYPE. SECURELY ANCHOR EACH DISPENSER TO <br /> BE USED ON ALL STEEL LINES. THE MATERIAL SPECIFICATION <br /> FOR BLACK IRON FITTINGS SHALL BE ASTM A 105 OR a. THE CONDUIT SYSTEM AND ALL CONDUCTING CONCRETE ISLAND PER DWG. J-2. <br /> ASTM A 181. WIRE ENCLOSURES SHOULD BE SECURELY 2. PADLOCK ALL DISPENSER NOZZLES AND ALLOW <br /> BONDED TOGETHE <br /> R <br /> E <br /> 3. TAPED COATINGS DISPENSER SHIPf'fNG CARTON OR GRATING t0 <br /> 2. CONDUIT MATERIAL SHALL CONFORM TO TIRE REMAIN OVER DISPENSERS FOR PROTECTION <br /> a. CONTRACTOR SHALL TIGHTLY WRAP THE FOLLOWING 5(,-HED'JLE: AFTER INSTALLATION. <br /> j 2' STEEL TANK ANNULUS RISER, INCLUDING E, p ISPENSER CAL IBR4TION <br /> i THREADS AND FITTINGS, AND VENT LINES a. BELOW GROUND - CONDUITS SHALL BE PVC COATED <br /> AS INDICATED BELOW. RIGID GALVANIZED STEEL AND LAID A MINIMUM OF 24' 1. DISPENSER METERS SHALL BE ADJUSTED AS NEAR <br /> b. APPLY TWO (2) LAYERS bF 1-INCH WIDE BELOW GRADE. AS POSSIBLE TO ZERO ERROR <br /> CORROSION PROTECTION TAPE (POLYKEN In. ABOVE GROUND AND OUTSIDE OF 2, ADVISE UNOGAL'S REPRESENTATIVE OF ANY <br /> 940 OR SCOTGHWRAP 50 E0 MIL THICK). BUILDING - CONDUIT SHALL BE HOT- METER THAT CANNOT BE HELD t0 PLUS-OR-MINUS <br /> EACH LAYER SHALL BE SPIRAL WRAPPED DIPPED GALVANIZED RIGID STEEL CONDUIT 3 CUBIC INCHES OF TOLERANCE IN A 5- <br /> WITH A 1/2 WIDTH OVERLAP. AT CONNECTIONS CONFORM'INCs TO ANSI STANDARD W.I. <br /> GALLON MEASURE, FOR REPAIR UNDER <br /> BETWEEN STEEL AND FIBERGLASS PIPE, <br /> TAPE SHALL EXTEND 2 INCHES (MIN.) ONTO c. INSIDE THE BUILDINGS - CONDUIT NOT MANUFACTURER'S WARRANTY. <br /> FIBERGLASS PIPE. TAPE SHALL BE CARRIED CONCEALED SHALL BE HOT-DIPPED 3. TEST WILL BE MADE ACCORDING TO METHODS <br /> UP TO THE 2-INCH COUPL fNG AT VENT L INES. GALVANIZED EMT CONFORMING TO ANSI PRESCRIBED BY DEPARTMENT OF LLE IGHTS AND <br /> THREADS SHALL BE CLEAN, FULL LENGTH, STANDARD C803, MEASURES <br /> COATED WITH PETROLEUM RESISTANT THREAD <br /> LUBRICANT (PERMATEX 0 2, OR EQUAL) 3. CONDUIT SEALS IN HAZARDS LOCATIONS SHALL-BE <br /> TIGHTEN PIPE AND FITTINGS TO REFUSAL. LOCATED A$ FOLLOU*: F. TESTING CONTAINMENT I30X (TANK SUMPAND <br /> a. IN EACH CONDUIT RUN ENTERING AN ENCLOSURE FOR 1215PENSFES PAN) <br /> 3 E. F15ERGLA55 REINFORCED EPDXY PIPING 5YSTE;M SWITCHES, PANELBOARDS, WIREWAYS, CIRCUIT 3 <br /> 1 <br /> BREAKERS, OR OTHER APPARATUS THAT MAY PRODUCE . AFTER PIPING INSTALLATION AND PRIOR 70 <br /> 1. PfPI MAt I SPARKS, ARCS, OR HIGH TEMPERATURES, SEALS SHALL BAGKFILLENCs, EACH CONTAINMENT BOX SHALL BE <br /> BE INSTALLED 18' FROM SUCH ENCLOSURES. WATER TESTED IN THE PRESENCE OF A UNOCAL <br /> a. ALL PIPING AND FITTINGS, EITHER SINGLE WALL EXPLOSION PROOF UNIONS, COUPLINGS, REDUCTION <br /> OR DOUBLE WALL, SHALL BE AMERON OR A.O. ELBOWS AND CONDUIT BODIES SHALL BE THE ONLY 2. THIS WATER TEST SHALL CONSIST OF FILLING THE <br /> SMITH (RED THREAD IIA) PIPE WITH ENCLOSURES OR FITTINGS PERMITTED BETWEEN THE CONTAINMENT BOX WITH WATER TO A LEVEL 1' <br /> UNDERWRITERS LABEL AND COMPATIBLE SEAL FITTING AND THE ENCLOSURE- BELOW THE TOP OF THE CONTAINMENT 50X- <br /> WITH <br /> OXWITH ETHANOL AND METHANOL FUEL THE SEAL. FITTINGS SHALL BE THE FIRST CONDUIT FITTING AFTER THIS TEST SHOULD HAVE A DURATION OF 24 HOURS <br /> BLENDS. IED THREAD PIPINCs AND FITTINGS THE CONDUIT EMERGES FROM THE EARTH OR CONCRETE, MIN. <br /> ARE NOT INTERCHANGEABLE WITH AMERON <br /> DO NOT MIX MANUFACTURERS, b. METAL CONDUfTS, CONTAINING= NO UNIONS, GOUPLfW-sS, 3, UPON SUCCESSFUL COMPLETION OF WATER TEST, <br /> BOXES OR FITTINGS, THAT PASS COMPLETELY THROUGH CONTRACTOR SHALL PUMP OUT WATER FROM <br /> 4 b, IT 18 MANDATORY THAT THE CONTRACTOR BE A HAZARDOUS LOCATION, WITH NO FITTINGS LESS THAN CONTAINMENT BOX, <br /> FAMILIAR WITH THE CURRENT AMERON 12' BEYOND EACH BOUNDARY SHALL NOT BE REQUIRED <br /> AND RED THREAD IfA, INSTALLATION TO BE SEALED IF THE TERMINATION POINTS OF THE 4. CONTRACTOR SHALL MAKE ANY REPAIRS TO <br /> MANUALS, AND OTHER MANUFACTURERS' UNBROKEN CONDUIT ARE IN UNCLASSIFIED LOCATIONS. CONTAINMENT BOX A5 REQUIRED IN ORDER TO <br /> BULLETINS AND PERTAININGRATURE PERTAININ <br /> TD FIBERGLASS REINFORCED PIPE. PASS THIS WATER TIGHTNESS TEST, <br /> D. GROUNp INCA <br /> 2_ INSTALLATIONPRC�GE-PUK <br /> a. PIPE INSTALLER SHALL STRICTLY ADHERE t0 THE GROUNDING SYSTEM SHALL BE INSTALLED IN <br /> .ACCORDANCE WITH THE LATEST EDITION OF THE <br /> MANUFACTURER'S RECOMMENDED PROCEDURES <br /> NATIONAL ELECTRIC GORE. ALL MOTORS, <br /> FOR INSTALLATION. NO DEVIATION FROM THESE <br /> EQUIPMENT, AND CONDUIT SYSTEMS <br /> PROCEDURES IS ALLOWED WITHOUT APPROVAL STARTING <br /> SHALL BE GROUNDED. THE WATER SUPPLY LINES <br /> OF PROJECT ENGINEER AND STEEL BUILDING SHALL BE MADE A PART OF <br /> CAUTION: BY REFERRING TO GENERAL ARRANGEMENT THE GROL.INDING ELECTRODE. THE GROUNDING <br /> DRAWING, CONTRACTOR SHALL PER cMIT NO STAKES ELECTRODEGONDIiCtOR SHALL BE SIZED <br /> AC-GORDINCs TO THE NATIONAL ELECTRIC CODE <br /> TO BE DRIVEN IN THE VICINITY OF ANY FIBERGLASS <br /> (1990), BUT SHALL BE NO SMALLER THAN "'6 AWG <br /> UNDERGROUND PIPING INSTALLATION COPPER <br /> b. CONTRACTOR SHALL USE APPROPRIATE PERSONAL <br /> SAFETY WHEN HANDLING FIBERGLASS PIPE, ADHESIVE <br /> AND SOLVENTS. THE USE OF GLOVES, SAFETY GLASSES, <br /> DUST MASK, ETC, ARE MINIMUM REQUIREMENTS. ALL <br /> APPLICABLE HEALTH AND SAFETY CODES ARE TO BE <br /> FOLLOWED <br /> DESTROY F LfI:R PRINTS <br /> REV. KQ. Aar° APPROVAL RECORD <br /> REV DATE REVISED APPROVALS <br /> © UNION OIL OF CALIFORNIA, dba UNOCAL, 1994 _ MILENE �p��� " ` �A�� <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ! IssulnD FOR C.U.P. I <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS - I CHECKED BY W° - GENERAL SPECIFICATIONS, PIPING AND TESTING <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE Issu�D FOR ALAN CHECK � G10" °�'" '"� `' ' DA-,T <br /> ` <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL ° <br /> ISSUED FOR GEN. BID I _ __ - ----- ----_ ___ <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE i �� 2_8-95 t �+R y Mn IDkAWING No. REV NO. <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT ISSUED FOR CONSTRUCT. iSHE <br /> Er <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL UNOCAL* _ I <br /> IN WRITING. -- ------ -.T ' RECORD DRAWING I s� NONE ImwmucnO, 7 DATE J . <br /> A B C D K:\UN\UN1582\JDWGS\STI} <br />