A B C D E F
<br /> GENERAL NOTES
<br /> 2' DOUBLE WALL � � I 81 OCTANE TANK
<br /> Ff BERGLASS SHOWN SEE DWG. J-1.1
<br /> PRODUCT LINE { k i FOR MANIFOLD DETAILS PLAN VIEW SHOWS SUGGESTED PIPING
<br /> BEL I ALL UNUSED TANK OPENINGS SHALL BE TIGHTLY
<br /> TO DISPENSERS AT 92 OCTANE LANK ORIENTATION. IN ELEVATION VIEW BELOW,
<br /> S' 8' i PIPINCs HAS BEEN ROTATED FOR CLARITY SECURED WITH PIPE PLUG, INSTALLED IN ACCORDANCE
<br /> 1-0 3 SINCsLE WALL ( INSTALL 2 UNION BETWEEN TURBINE HEAD
<br /> VAPOR CAP 4 3' x 4' , TYP. TYP. , FIBERGLASS VAPOR AND SHUT-OFF VALVE WITH MANUFACTURERS SPECIFiGATIONS.
<br /> ADAPTOR (DRY BREAK) RECOVERY MANIFOLD 2' x 24' M / S x FEMALE
<br /> TO OTHER TANK ' FLEXIBLE CONNECTOR 2 ALIKE WITH ATTHE EXCEPTION OF HE r-ILL,BLE CAFS SHALL HAVE CLAP KEYED
<br /> 1 (TYP-)
<br /> 3/4' CONDUIT FROM J-BOX �
<br /> TO LEAK DETECTOR SENSOR 3. TANKS SHALL BE TESTED AND INSTALLED IN
<br /> : IN SUMP ACCORDANCE WITH MANUFACTURERS RECOMMENDA-
<br /> 4 x4 FILL CAP ,
<br /> TIONS AS WELL 45 LOCAL ORDINANCES-SEE DWG. J-O- I.
<br /> + 4 ADAPTOR 4' EXTRACTOR GAP I 3' SINGLE WALL
<br /> F
<br /> # CONDUIT FROM MONITOR , FIBERGLASS VAPOR 4. ALL CONTAINMENT SUMP ASSEMBLIES SHALL BE
<br /> PANEL IN BUILDING TO J-BO� ' , (EXTRACTOR BODY AND RECOVERY MANIFOLD FIBERGLASSED INSIDE 4 OUTSIDE TO TANK RING AND
<br /> SEE NOTE 8 AND 15 _ I _ — - BALL FLOAT UNDER) FROM DISPENSER ISLAND CAPABLE OF WITHSTANDING HYDROSTATIC TESTING.
<br /> ,
<br /> k Q JUNCTION BOX 3' BELL x MALE NPT CONTRACTOR'S OPTION: 5. ASSURE UNUSED PORTS ARE PLUGGED ON
<br /> FIBERGLASS ADAPTOR (TYP.) SUBSTITUTE 3' MALE x MALE FLEX TURBINE ,AND LEAK DETECTOR-
<br /> CONNECTOR
<br /> ETECTORCONNECTOR FOR 3' STEEL PIPE IN SUMP
<br /> + AS SHOWN 6. S AND HIG+4
<br /> CONDUITS.
<br /> TURBINE
<br /> BE RUN IN
<br /> C SEPARATE DEDICATED
<br /> O
<br /> TURBINE PUMPHEAD
<br /> 1. ALL STEEL PIPING: INSIDE SPILL CONTAINMENT SUMP
<br /> SPILL CONTAINMENT SPECIFY DIA. OF TANK ASSEMBLY SHALL BE 8-CH. 40 BLACK IRON, INCLUDINCs
<br /> 3/4'
<br /> ' CONDUIT SUMP ASSEMBLY ALL 4' RISERS.
<br /> SEE NOTE 8 ,
<br /> 16' DIA_ MONITORIN , j LEAK DETECTOR SUMP PENETRATION FITTINGS 8_ ROUTE CONDUITS ALONG INSIDE PERIMETER OF SUMP TO
<br /> WELL BOX ASSEMBLY '
<br /> PLUG CtYP. # SENSOR
<br /> J SIZE A5 REQUIRED PROVIDE EASE OF ACCESS TO PIPINCs IN THE FUTURE.
<br /> FOR CONDUIT SCHEMATIC SEE DWL.s. J-8.
<br /> k � �
<br /> 1 t
<br /> 2' FIBERGLASS VENT LINE 9. ALL JUNCTION BOXES TO BE EXPLOSION PROOF WITH
<br /> I , I TO VENT RISERS. (MAY BE UNION HUBS, GROUSE-HINDS GUAG-1115
<br /> ` J ' PIPED INTO FILL SUMP.)
<br /> 4'-0' TYP. 36' DfA. FELL BOX ; -- 3/4' CONDUIT FROM BUILDING 10. ALL CONDUITS TO HAVE SEAL-OFFS PER LATEST EDITION
<br /> FBA-TE 4 COVER TO 'T•UR51NE PUMP. SEE NOTE 8 OF THE NATIONAL ELECTRICAL CODE.
<br /> FILL SPILL CONTAINMENT
<br /> I I SUP ASSEMBLY OUTER EDGE
<br /> k k 11. USE CABLE CONNECTOR FITTINCs5 (CROUSE-HINDS CGB OR
<br /> 36' D[A. FILL BOX FRAME t � � TRUCK VAPOR 04 BARS A 18' O.G. INSTALL MECHANICAL
<br /> I COVER WITH SPILL CONTAINMENT I RECOVERY BOTH WAYS-TYP. LEAK DETECTOR APPROVED SEQUAL)TO
<br /> 0 MONITOR 1 LEVEL CxAUGE GABLE
<br /> ' FILL BOX ASSEMBLY W/ DRAIN I ' SEE DWG. J-3 , CONNECTIONS t0 J-SOXE3 t PIPE FITTfNCxS,
<br /> 24' TYP. 3' 3' VALVE. 24' TYP.
<br /> 6 REINFORCED CONCRETE SLAB � 12. ALL CONDUIT AND PIPING TO PENETRATE SUMPS
<br /> SLOPE ` I , , LOPE ,
<br /> 2' MIN-
<br /> CROWN
<br /> IN k I SEE DWG. J-3 f 2 MIN. PERPENDICULAR TO SUMP WALL.
<br /> CROWN (TYP) CROWN (TYP)
<br /> . 4 — , — 4_.'
<br /> 4 -
<br /> :4-
<br /> - - ; Q • . -4. 4 d 13. L BO CONTRACTOR 18 TO ASSURE
<br /> 1 _ � . . � - 1 �:. _••� r, . . �. � _ _ +- �. .. .. �•_ � �.� WHEN INSTALLING FILL X, GONt T
<br /> Q, 4 d- THAT THE SPACE BETWEEN THE FILL BOX SKIRT AND THE
<br /> 2 � a; s '4' .77 a d'' p D Q b TOP OF THE CONTAINMENT SUMP IS EQUALLY SPACED 2
<br /> f 4.
<br /> 2' BALL VALVE ALL AROUND. PROVIDE ADEQUATE SUPPORT FOR FILL
<br /> I i PEA GRAVEL ` BOX DURING CONCRETE INSTALLATION SUCH THAT FILL
<br /> I I / BACKFILL SEE 3' TYP.--J 3/4' CONDUIT FROM BUILDING BOX DOES NOT MOVE RELATIVE TO CONTAINMENT SUMP.
<br /> 4' BLACK f TO TURBINE PUMP. SEE NOTE 8 CONTAINMENT SUMP LID Mil $ BE INSTALLED ON TURBINE
<br /> z I IRON RISER DWG. J-0. I _ I I E r
<br /> GABLE GRIP 12 MIN. .•ONTAINMENt SUMP TO ASSURE THAT NO WATER ENTRY
<br /> (,ryP.) 3' SINGLE WALL FIBERGsLASS '� CAN OCCUR
<br /> VAPOR RECOVERY MANIFOLD (TYP)
<br /> EYS SEAL FITTING
<br /> 1 JUNCTION BOX I I , , FROM DISPENSER ISLAND
<br /> (TYP) SEE NOTE 9 � f ! I 14. ALL PIfmINCs t0 SLOPE DOti�l TOWARD TANKS AT A
<br /> 3' SINGLE WALL I MINIMUM OF 1/4' PER FOOT.
<br /> EYS SEALS-TY { I I , FIBERGLA33 VAPOR
<br /> I' CONDUIT FROM MONITOR I I I I RECOVERY MANIFOLD { i 15. MONITC'R CONDUIT MAY ENTER TURBINE SUMP FIRST
<br /> PANEL IN BUILDING TO J-BOX. ] ! ! (SLOPE DOWN D
<br /> I I I 92 OCTANE TANK) DEPENDENT ON SITE ARRANGEMENT AND TANK
<br /> SEE NOTE 8 AND 15 I I i ! I I I
<br /> LOCATIONS.
<br /> an r / I ! TO VENT RISE". (MAYBE
<br /> { I
<br /> I I ' I I ' I PIPED INTO FILL SUMP.)
<br /> 2' BLACK IRON RISERI I { 2' DOUBLE WALL
<br /> (WRAP PER DWG. J-0. 2, FiBERCsLASS 111 I I 43, I.D. COLLAR (TYP) 2 BLACK IRON PLUG
<br /> SECTION I-0-3) � -_.._... j i -- -- ------ 01L� -.+.-... � , (AFTER TIGHTENING PLUG,T� 7P�NSRS
<br /> SEAL WITH FI5ERGsLA33
<br /> 1 — —
<br /> _ _ _ STEEL
<br /> CLOTH ,AND RESIN) �x 'GO � d �
<br /> I Ii1- ---- ----- --_��— --= �_� � �-7�-- -_-_----_----- ----_-- --�{ 1 L�VE�� STORAGE TANKS
<br /> L.
<br /> ! II I I 3' x 2' REDUCING I i I 1
<br /> TEST BOOT I
<br /> I APPROVED DOUBLE WALL STEEL, FIBERGLASS COATED TANKS
<br /> ARE PER DWG. J-0. 3, MATERIAL FURNISHED BY UNOCAL.
<br /> I ]I} I f { I I }i I SEE GENERAL ARRANGEMENT DRAWING FOR QUANTITY AND
<br /> LOCATION OF TANKS.
<br /> �I- EXTRACTOR VALVE AND GA50L INE 570RAGE TANKS
<br /> BALL FLOAT ASSEMBLY i I I II I UNLESS OTHERWISE SPECIFIED, TANKS SHALL 15E INSTALLED
<br /> ! ] II W/ BLEED HOLE I ! I f FIVE (5) FEET BELOW FINISHED YARD GRADE LUItH TWO (2) FEET
<br /> I ! ]11 FILL TUBE W OVERFILL I I MIN. BETWEEN TANKS. TANKS SHALL BE INSTALLED WITH A
<br /> CRANE ONLY. CRANE SHOULD BE ADEQUATELY SIZED TO PROTECTION I I I ACCOMODATE TANK SIZES SPECIFIED ON THE GENERAL
<br /> I i I I� ED GASOLINE
<br /> IN - � I �� I � ARRANGsEMENT DRAWING AND WEIGHTS AS INDICATED IN THE
<br /> 3 I U `.1� �/ TABLES HERE=ON TANKS SHALL BE SET ON A FIRM BASE OF 12'
<br /> d 1111 I WALL
<br /> I I I 11 I THICK PEA GRAVEL AND SURROUNDED ON ALL SIDES BY A
<br /> I �� �,,. MINIMUM THICKNESS 12' OF GLEAN PEA GRAVEL.
<br /> - i i } � I I
<br /> I it I f UNQ F-fRGFR0UNi7,> TANK i i j i II i
<br /> PEAI ! I 1 "' I i I i II 1 PEA I CONTRACTOR SHALL INSTALL FILL RISER AND LEVEL TANK TO
<br /> GRAVEL { I i1 ! I I I i I II I GRAVEL KEEP RISER STRAIGHT BEFORE PROCEEDING TO BACKFILL.
<br /> I 1 !! I I I I ( I II I PERSONNEL CHECKING LEVEL SHALL BE LOWERED TO TANK
<br /> I ! 11 I I i t I I II I TOP IN SAFETY HARNESS_
<br /> 11 1 I MACsNETOSTRICTI VE PROBE I I I f i t I
<br /> ! �I I I I I FOR ADDITIONAL INFORMATION SEE DWG:. J-0. i.
<br /> I I f1 I I I I I I II f
<br /> I I I I SUBMERSIBLE it I
<br /> 1111 { i PUMP I I I I TANK f=EC:1FIr ATIONS
<br /> I ! II 1/4' THK PLATE I I II I
<br /> { III (FURNISHED BY TANK i I II I
<br /> ANNULUS LEAK 11 II MANUFACTURER)
<br /> DETECTOR SENSOR _ I I �I 457 I I _
<br /> - )< y) II I I �2N LUELD INCA GO_ I
<br /> IIL - -_-_ _-_-- _____-______=====c -- - _-_ - _ _--J I CAPACITY X DRY WEIGHT
<br /> 1 CGALS.) (LBS.)
<br /> — —. __.._..... _. ._ —._...._.._.._ - �—._._--------_. -- - ---------- ---- - - - ------------- ----- _ - - _ _ _ � _
<br /> CONTRACTOR SHALL FIELD 15 121' 26'-1' _
<br /> GUT LOWER END OF FILL GRAVEL BED (SEE DUrS. J-0. 1) --
<br /> '� TANK OUTER--- 0
<br /> ' TUBE AT 457 4 INSTALL -
<br /> r
<br /> PER MFRS. RECOMMENDED SET TANK LEVEL OR SLOPE;DOWN • EDGE --
<br /> PROCEDURE. TOWARD FILL END 1' MAX. C' i? M,4NUF4GTURINCx INC I
<br /> CAPACITYX �� ; jPRY WEIGHT
<br /> I .
<br /> 'Y' I'_0' (GAL S.)
<br /> -� /� TYP. 15�c�m 113' - 301-31 -��r•-t-,,*�
<br /> TYPICAL � QZ)UCT TANK � ELEVATION
<br /> -�- •
<br /> -
<br /> -,--- --� -- — — - APPROVALS 4
<br /> ' REV DATE � REVISED ��°Y�„�'� RE' �°. "PP'°
<br /> 1994 - -- - - APPROVAL RECORD
<br /> c UNION OIL OF CALIFORNIA, d b a UNOCAL, �- I MILESTONE DATE APPROVAL DRAWN TAIL
<br /> ----
<br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS -V — - ISSUED FOR C.U.P. UNLEADED GASOLINE
<br /> -- —--
<br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS __- �_�_ _- _ ----— ISSUED FOR PLAN CHECK CHECKED &Y WD c��+u ENGiNEERINc MAW43 R) DATE UNDERGROUND FUEL UEL TANK INSTALLATION
<br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE
<br /> -------___ -. _._ _ .�_._.. APPROVED _
<br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL IssuEo FOR GEN. BID
<br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE E --- ------- _ -___ _- ____..._ ___- _ __ -____ _�. - REV _
<br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT ------ -- - ---- - -- - DATE 2-8-95 { UN�S > DATE DRAWING N0. N0, SHEET
<br /> 1 �� ISSUED FOR CONSTRUCT.
<br /> -- - -- _ UNOCAL. OF �I�
<br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL -i____-___.__-____..._-_.____ -._.______. ___._____-__.____ -_____ _r�. _....____.________.
<br /> -- _.___m_.__.-__._____.�____ RECORD DRAWING _ t-oNSTRUMN ENDN�7
<br /> IN WRITING. � —�--�- ___.----.__ _ --__�_�._ _._...— i �cA�.. 1�— 1
<br /> A B c D E K:\UN\UN 1 682\JDWGS\STD-�1
<br />
|