Laserfiche WebLink
A B C D E F <br /> 2' DOUBLE WALL --- CWWRAL NOTES <br /> FIBERGLASS <br /> PRODUCT LfNE PLAN VIEW SHOWS SUGGESTED PIPING <br /> TO DISPENSERS ORIENTATION. IN ELEVATION VIEW BELOW, 1. ALL UNUSED TANK OPENINGS SHALL BE TIGHTLY <br /> PIPING: HAS BEEN ROTATED FOR CLARITY SECURED WITH PIPE PLUG, INSTALLED IN ACCORDANCE <br /> i••- 8' 8' 3/4' CONDUIT FROM J-BOX ' INSTALL 2' UNION BETWEEN TURBINE HEAD WITH MANUFACTURERS SPECIFICATIONS. <br /> TYP. , TO LEAK DETECTOR SENSOR AND SHUT-OFF VALVE <br /> IN SUMP 4' EXTRACTOR CAP 2. ALL LOCKABLE CAPS SHALL HAVE PADLOCKS KEYED <br /> { (EXTRACTOR BODY AND ALIKE WITH THE EXCEPTION OF THE 'FILL' CAP <br /> 1 <br /> 2' PLUG (FOR FUTURE BALL FLOAT UNDER) <br /> VAPOR RECOVERY) ' 3. TANKS SHALL BE TESTED AND INSTALLED IN <br /> 4" x 4' FILL GAP 2' x 24" !`1 / 5 x FEMALE <br /> ACCORDANCE WITH MANUFACTURERS RECOI"'MENDA- <br /> ' f , TIONS AS WELL AS LOCAL ORDINANCES-BEE DWG. J-0_ I. <br /> ji <br /> t ADAPTORI I { SENSOR TEGTOR ' FLEXIBLE CONNECTOR <br /> I' CONDUIT FROM MONITOR <br /> PANEL IN BUlLDINCs TO J-BOX. (TYP) <br /> SEE NOTE 8 AND G _ _ _ _ —_ _ - 4' PLUG 4. ALL CONTAINMENT SUMP ASSEMBLIES SHALL BE <br /> FIBE}?GsLASSED INSIDE 4 OUTSIDE TO TANK RING AND <br /> i L JUNCTION BOX <br /> CAPABLE OF WITHSTANDING HYDROSTATIC 'TESTING. <br /> I <br /> 'O SEE NOTE 9 TURBINE PUMPHEAD 5. ASSURE UNUSED PORTS ARE PLUGGED ON <br /> SPECIFY DIA. OF TANK TURBINE AND LEAK DETECTOR. <br /> 2' BELL x MALE NPr <br /> 6. LOW AND HIGH VOLTAGE LINES SHALL BE RUN IN <br /> 00 FIBERGLASS ADAPTOR (TYP.) SEPARATE DEDICATED CONDUITS. <br /> 7. ALL STEEL PIPING INSIDE SPILL CONTAINMENT SUMP <br /> SPILL CONTAINMENT ASSEMBLY SHALL BE 5CH. 40 BLACK IRON, INCLUDING <br /> $ 3/4' CONDUIT I I SUMP ASSEMBLY ALL 4' RISERS. <br /> ib' DIA. MONITORI SEE NOTE 8 , <br /> WELL BOX ASSEMBLY R FIBERGLASS VAPOR I SUMP PENETRATION FITTINGS 8. ROUTE CONDUITS ALONG INSIDE PERIMETER OF SUMP TO <br /> RECOVERY LINE (FOR FUTURE) PROVIDE EASE OF ACCESS TO PIPING IN THE FUTURE, <br /> PLUG (TYP.), CAP INSIDE SUMP I SIZE AS REQUIRED <br /> FOR CONDUIT SCHEMATIC SEE DWG. J-8. <br /> FIBERGLASS VENINE BE Ci. ALL JUNCTION BOXES TO BE EXPL05iON PROOF WITH <br /> TO VENTRISERS. (MAY <br /> UNION HUBS, CROUSE-H I NDS GUAG 1175 <br /> I I I I PIPED INTO FILL SUMP.) <br /> 4'-0' TYP. # 36' DIA. FILL BOX 13/4' CONDUIT FROM BUILDING:I FRAME E COVER. TO TURBINE PUMP. SEE NOTE 9 10. ALL CONDUITS TO HAVE SEAL-OFFS PER LATEST EDITION <br /> yy.. <br /> TANK OUTER ED I FILL `t AFILL <br /> CONTAINMENTI OF THE NATIONAL ELECTRICAL CODE. <br /> ASSEMBLY 4 BARS • 18 O.G. <br /> fl. USE GABLE CONNECTOR FITTINGS (GROUSE-HINDS GGB OR <br /> INSTALL MECHANICAL APPROVED EQUAL) AT MONITOR 4 LEVEL GAUGE CABLE , <br /> I � , 36' DIA. FILL BOX FRAME a I � TRUCK VAPOR BOTH WAYS-TYP. LEAK DETECTOR CONNECTIONS r0 J- 1 <br /> COVER WITH SPILL CONTAINMENT RECOVERY SEE DWG_ J-3 <br /> FILL BOX ASSEMBLY W/ DRAIN <br /> BOXES PIPE FlrtiNCsB. <br /> 24' 3' 3` VALVE. 6' REINFORCED CONCRETE SLAB 24' <br /> I2. ALL CONDUIT PERPENDICULAR DTOIPSUMP WAPENETRATE SUMPS A <br /> 2' MIN, SLOPE I , ! � : SEE DWG. J-3 � � SLOPE 2' MIN. <br /> CROWN I 1 I CRO1l1N <br /> 77�t id_ - _ _' p Q 4 j d / - -�1 i Q ':� -. Q _ : a 13. WHEN INSTALLINCA FILL BOX, CONTRACTOR IS TO ASSURE <br /> iL <br /> � . "" HAT THE SPACE BETWEEN THE FILL BOX SKIRT AND THE <br /> Q' TOP OF THE CONTAINMENT SUMP IS EQUALLY SPACED. <br /> ALL AROUND. PROVIDE ADEQUATE SUPPORT FOR FILL <br /> Q' 2" BALL VALVE PEA GRAVEL BOX DURING CONCRETE INSTALLATION SUCH THAT I <br /> � Q <br /> U <br /> BACKFILL SEE 3' TYP. ` I FILL <br /> Y <br /> I 4 BLACK DWG J-0 I � BOX DOES NOT MOVE RELATIVE TO GONTAINMENr .811MP. <br /> G�+1TAlNMENt SUMP LID MUST BE INSTALLED ON TURBINE 1 IRON R15ER i GABLE GRIP12' MIN. CONTAINMENT SUMP TO ASSURE THAT NO WATER ENTRY <br /> 1: IE I (TYP. - 3/4' CONDUIT FROM BUILDING (TYP) n CAN OCCUR. <br /> EYS SEAL FITTING i <br /> JUNCTION SOX f � j � � i I i I f � TO TURBINE PUMP. SEE NOTE 8 <br /> (TYP) I 1ALL NG TO SLOPE <br /> 2' FIBERGLASS VAPOR I j 14. M NIMUM IOF 1 PER FOOT.T TOWARD TANKS AT A <br /> 1 EYS SEALS-TY { { <br /> I I � RECOVERY LINE (FOR FUTURE) <br /> 1' CONDUIT FROM MONITOR I I , I , CAP INSIDE SUMP-� I I 15, MONITOR CONDUIT MAY ENTER TURBINE SUMP FIRST <br /> PANEL IN BUILDING TO J-BOX. 1 l I I { 1 <br /> SEE NOTE 8 AND 15 DEPENDENT ON SITE ARRANGEMENT AND TANK <br /> 0 B I I I <br /> 2' DOUBLE WALL— I I I 1 2' FIBERGLAS VENT LINE LOCATIONS. <br /> 1 # # FIBERGLASSTO (MAY <br /> { ! + I I { PRODUCT LINE IANM <br /> PIPED VENT <br /> NTROSFI SUMP)BE <br /> 2' BLACK IRON RISER 1 TO DISPENSERS <br /> • 11# ---- --- !l1 i ilI -- -- ----- -- ---- II !I 1 I i -- 43' I.D. COLLAR (TYP.)PER DWC. J-0. 2, <br /> 2 BLACK IRON PLUG <br /> SECTION I-D-3) -- (AFTER TIGHTENING P <br /> LUG, <br /> --- --- SEAL WITH 1=15ERGsLASS <br /> - - - -- - -- - -..--. --•- - CLOTH AND RESIN) F1�3E1�L,4�-COATED DOU5LE-W�41..L STEEL <br /> L=-=-=_-_ _ --=---_=_---- -____ <br />