Laserfiche WebLink
JUN -26-2007 16:07 Service Station Systems 408 938 8988 P.08 <br />9. FILL RISER CONTAINMENT CTIMP TF - <br />MN( - <br />Facility is Not Equipped With Fill Riser Containment Sumps <br />❑ <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />❑ Other (Spec) <br />® Industry Standard Cj Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />Pg Hydrostatic <br />Test Equipment Used: Incon Sump Tester <br />Fill Sump # 87 <br />Fill Sump # 89 <br />Equipment Resolution: <br />Fill Sump # 91 <br />+/- 0.002" <br />Fill Sump # Diesel <br />Sump Diameter. <br />64" <br />64" <br />64" <br />64" <br />Sump Depth: <br />48" <br />48" <br />48" <br />48" <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />17" <br />15" <br />I S" <br />] 6" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />15" <br />16" <br />l5" <br />16" <br />Condition of sump prior to <br />testing: <br />Good <br />Good <br />Good <br />Good <br />Portion of Sump Tested <br />2" above piping <br />2" above piping <br />2" above i in <br />2" above piping <br />Sump Material: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />8:14 am <br />8:14 am <br />8: l4 am <br />8:32 am <br />Initial Reading (R,): <br />4.0445 <br />4.6657 <br />3.2586 <br />4.7382 <br />Test End Time: <br />8:30 am <br />8:30 am <br />8:30 am <br />8:47 am <br />Final Reading RF: <br />4.0441 <br />4.6652 <br />3.2582 <br />4.7380 <br />Test Duration: <br />16 min. <br />16 min. <br />16 min. <br />15 min. <br />Change in Reading(RF-Rt): <br />-0.0004 <br />-0.0005 <br />-0.0004 <br />-0.0002 <br />Pass/Fail Threshold or Criteria: <br />+/-0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+/-0,00211 <br />Test Result. <br />® Pass Fail <br />M Pass Fail <br />IR Pass Fail <br />® Pass Fail <br />Is there a sensor in the sump? <br />® Yes ❑ No <br />® Yes ❑ No <br />® Yes ❑ No <br />N Yes ❑ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />W Yes ❑ No ❑NA <br />® Yes ❑ No DNA <br />Z Yes ❑ No []NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />yes ❑ No ❑ NA <br />0®Yes ❑ No ❑NA <br />® Yes ❑ No ❑NA <br />® Yes ❑ No LINA <br />Comments — (include information on re airs made prior to restin , and recommended follow-ap for jailed tests) <br />tensor functionality was not confirmed This procedure is not part of the <br />Secondary Containment testing scone of work". <br />