Laserfiche WebLink
TUN -26-2007 16:0? Service Station Systems 408 938 8888 P.10 <br />v <br />w <br />IT. SPILLJ0VF.RFTT.T. rnNTATNMFNT AAArra <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer 0 Industry Standard ❑ Professional Engineer <br />Q Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br />i N <br />Vapor Spill Box # 87 Vapor Spill Box # 89 Vapor Spill Box tl 91 Vapor Spill Box N Diesel <br />Bucket Diameter: <br />10" <br />10" 10" <br />10" <br />Bucket Depth: <br />12" <br />12" 12" <br />12" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min. <br />10 min. 10 min. <br />10 min. <br />Test Start Time: <br />7:15 am <br />7:36 am 7:36 am <br />7:15 am <br />Initial Reading (RJ: <br />.3010 <br />3.8964 4.8270 <br />1.3745 <br />Test End Time: <br />7:31 am <br />7:51 am 7:52 am <br />7:31 am <br />Final Reading (Ry): <br />.0000 <br />3.8963 4.8263 <br />1.3744 <br />Test Duration: <br />16 min. <br />15 min. 16 min. <br />16 min. <br />Change in Reading (RF -R): <br />.3010 <br />-0.0001 -0.0007 <br />-0.0001 <br />Pass/Fail Threshold or <br />Criteria: <br />+/_0.002" <br />+/-0.002" +/-0.002" <br />+/-0.002" <br />Test Result: <br />I Pass 0 Fail <br />® Pass Fail M Pass Fail <br />I ® Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />87 vapor bucket failed Needs to be replaced — 5 gallon CNI <br />TOTAL P.10 <br />