Laserfiche WebLink
SWRCB,January 2002 Page '7 of �7 <br /> 9. '43VMIJOVERFILL CONTAINMENT BOVES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 11 <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested IK <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 lndu,,—fry Standard 0 Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: 11 Pressure LI Vacuum 0 Hydros <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Boz# Spill Box# Spill Box# <br /> Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: rf <br /> Test Start Time: <br /> Initial Reading(Rd: <br /> Test End Time: <br /> Final Reading(R,);,,-' <br /> Test Durati <br /> Ch ge'in-Aeading(RF Ro: <br /> Pas Threshold or <br /> Criteria: <br /> Test Result: El Pass 0 Fail 0 Pass D Fail 11 Pass El ffiFailEl Pass 0 Fail <br /> comffk�n —(i Jude information on repairs made prilarr to teNtI. d <br /> an recommended fiViow-uporfailed tests) <br /> 0! -Vx bl;e- ;,4,p F <br />