My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
COMPLIANCE INFO 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:06 PM
Creation date
11/8/2018 9:44:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2467\PR0231818\COMPLIANCE INFO 2002 - 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 d/ 00/ Page_of_ <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> Sump#1 Sump#2 Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 33" 33" <br /> Sump Material: Poly Poly <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 14" 14" <br /> Height from Tank Top to Lowest 10" 10" <br /> Electrical Penet ation: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 2"above highest Piping Penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both xYes ❑No ❑NA xYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)? <br /> ater)?� <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown? xYes ❑No ❑NA xYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> operational?* p Yes xNo ❑NA ❑Yes xNo ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 11:40 11:51 <br /> Initial Reading(R,): .00" .00" .00" .00" <br /> Test End Time: 12:10 12:21 <br /> Final Reading(RF): .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R,): .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result. x Pass ❑Fail x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? xYes ❑No ❑NA xYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No DNA— <br /> Was <br /> NAWas sensor properly replaced and xYes ❑No ❑NA xYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.