My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
COMPLIANCE INFO 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:06 PM
Creation date
11/8/2018 9:44:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2467\PR0231818\COMPLIANCE INFO 2002 - 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 *mss , Va./ Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: D UDC Manufacturer D Industry Standard X Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure -❑Vacuum X Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> UDC#1&2 UDC#3&4 UDC# IUDC# <br /> UDC Manufacturer: Total Containment Total Containment <br /> UDC Material: Poly Poly <br /> UDCDepth: 31" 31" <br /> Height from UDC Bottom to Top ill, <br /> 11" <br /> of Highest Piping Penetration: <br /> He=m UDC Bottom to 10" 10" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested 2"above highest Piping enetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both xYes D No D NA xYes D No D NA D Yes D No D NA D Yes D No D NA <br /> product and water)?. <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* xYes D No DNA xYes D No DNA D Yes D No DNA D Yes D No DNA <br /> Was fail-safe verified to be <br /> o erational7o D Yes D No DNA D Yes xNo DNA D Yes D No DNA D Yes D No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 11:58 12:17 <br /> Initial Reading(Rr): .00" .00" .00" .00" <br /> Test End Time: 12:28 12:47 <br /> Final Reading(RF): .00125 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R): .00125 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass D Fail x Pass D Fail D Pass D Fail D Pass D Fall <br /> Was sensor removed for testing? x Yes D No DNA xYes D No DNA x Yes D No D NA x Yes D No D NA <br /> Was sensor properly replaced and x Yes D No D NA x Yes D No DNA xYes D No DNA xYes D No DNA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommendedfollow-up forfailed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to ilk of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.