Laserfiche WebLink
F: In-Tank Gauging /SIR Equij*fent: :heck this box if taus. waging is used only for inventory control. <br /> ❑ Check (his box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank ganging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> L3 Y;; ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> I :M <br /> *In the Section H,belowr <br /> , descibe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com ete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated [o verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 g.h.; Cl 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> ❑ yes No* Were all LLDa confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ' o* For mechanical LLDs, does the LLD restrict product now if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a IeakT <br /> U_N�/A <br /> ❑ sabled <br /> Yes ❑ No.* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is di <br /> �p or disconnected? <br /> ] Yes ❑ IW* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> C'N/A malfunctions or fails a test? <br /> For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ] Yes E3 N * <br /> NIA <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below, describe how and when these deficiencies were or will be corrected. <br /> c�/ate°3 (� <br /> H. Comments %`J 7 �5 G eeb t�[3� }—.v e. } `® Pt <br /> to p►t 4 P r / <br /> 7 fArm 77k';'ho <br /> lis w g 4-a n a rAey L f'h r AV <br /> Page 3 of 3 03101 <br />