Laserfiche WebLink
SWRCB,MAY 2002 �"� '' Page_r of 5 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed by: ❑ Piping Manufacturer Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Developed by: grPressure ❑ vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: #1 psi <br /> Piping Run# 1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: FRP <br /> Piping Manufacturer: <br /> Piping Diameter: 2 1 K <br /> Length of Piping Run: '-I <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: rEs7- DL4or. <br /> Wait time between applying <br /> pressure starting test: <br /> 5 knr <br /> Test Start Time: 1.5 -a <br /> Initial Reading(Rj) -5 ps L <br /> Test End Time: yw <br /> Final Reading(RF): S <br /> Test Duration: ` f <br /> Change in Reading(Rr-Ra): �r <br /> Pass/Fail Threshold or Criteria: O S G <br /> TEST RESULT: PASS ❑ FAIL ❑ PASS ❑ FAIL ❑ PASS ❑ FAIL ❑ PASS ❑ FAIL <br /> Comments—(include information on repairs made prior to tertin& and recommended follow-up for failed tests) <br /> e, 1&eotiGlnary 0 r• — <br /> �rorss <br />