Laserfiche WebLink
Page V of 5 <br /> SWRCB, MAY 2002 <br /> 6. PIPING SUMP TESTING Professional Engineer <br /> Manufacturer (] Industry Standard <br /> Test Method Developed by: Q Sum Other(Specify) <br /> vacuum �.Hydrostatic <br /> "" Pressure <br /> Test Method- Q Other(Specify) <br /> Equipment Resolution: .05 gp6 <br /> Test Equipment Used: VMI <br /> Sump# spyplt Sump#� �,r,�y4''tJ <br /> Sump# Sump# <br /> Sump Diameter ` <br /> Sump Depth <br /> Sump Material: <br /> Height from Tank Top to Top of w <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical-Penetration: <br /> Condition of sump prior to testing: <br /> ODe� <br /> Portion of Sump Tested: <br /> Does turbine shut down when sump e <br /> sensor detects either product or water? <br /> Turbine shutdown response time: G_ e C <br /> is system programmed for <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ f <br /> vacuum/water&starting test: <br /> Test Stag Time: <br /> 00 OD <br /> $SO»t J <br /> Initial Reading(Rr) *'^ <br /> Test End Time: ifs y" <br /> 6� <br /> Final Reading(Rr): <br /> Test Duration: <br /> ha0 <br /> Change in Reading(RF-Rr): sql <br /> pass/Fail Threshold or Criteria: ! 0.5 `1 lay PASS FAIL ❑ PASS FAIL ❑ PASS ❑ FAIL <br /> PASS [I FAIL <br /> TEST RESULT: � y� No C3 NA ❑1'�O No�NA ❑Yes[�No[.�NA <br /> Was sensor removed for testing? [ Yes No Q NA ❑ <br /> Was sensor properly replaced& <br /> MYes NoIINA �YesQNo[]NA �YesQNo�NA <br /> verified functional after testing? to <br /> No NA <br /> information on repairs made riot to testing, and recommended follow-up for failed tests) <br /> Comments—(include P P <br />