Laserfiche WebLink
SWRCB, MAY 2002 ragu ui S <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed by: ❑ UDC Manufacturer ❑ Industry Standard aprofessional Engineer <br /> ❑ Other(Specify) <br /> Test Method Developed by: ❑ Pressure ❑ Vacuum Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: VMI Equipment Resolution: .05 gph <br /> UDC# /-� UDC# 3-q UDC# UDC# <br /> UDC Manufacturer: 14 k1lol Ill 7 <br /> UDC Materials: Poll Div <br /> UDC Depth: 0 <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: L7 „e <br /> Height from UDC Bottom to <br /> Lowest Electrical-Penetration: D <br /> to <br /> Condition of UDC prior to testing: OQ <br /> Portion of UDC Tested: ALL ALL ALL ALL <br /> Does turbine shut down when UDC <br /> sensor detects either product or water? 11, <br /> Turbine shutdown response time: G � <br /> Is system programmed for <br /> fail-safe shutdown? y. <br /> Was fail-safe verified to be <br /> operational? y <br /> Wait time between applying pressure/ <br /> vacuum/water&starting test: - 3 <br /> Test Start Time: 9Y. �_- <br /> Initial Reading (R�) <br /> O6 . <br /> Test End Time: AD>15 C^^ D <br /> Final Reading(RF): <br /> Test Duration: ,OAvS ys <br /> Change in Reading(Rr- Rt): <br /> Pass/Fail Threshold or Criteria: j O,$' Ci P 11 h <br /> TEST RESULT: qrPASS ❑ FAIL ZPASS ❑ FAIL ❑ PASS ❑ FAIL ❑ PASS ❑ FAIL <br /> Was sensor removed for testing? 7Yes❑No❑NA RYes7jNoCjNA ❑Yes❑No[jNA ❑Yes❑No❑NA <br /> Was sensor properly replaced & <br /> verified functional after testing? Yes Cl ❑NA Yes❑No❑NA ❑Yes r3No C3NA 71 Yes C]No❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />