Laserfiche WebLink
SWRCB, MAY 2002 Page_ y of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed by: ❑ Piping Manufacturer 2r Industry Standard ❑ Professional Engineer <br /> 71 Other(Specify) <br /> Test Method Developed by: grPressure ❑ Vacuum ❑ Hydrostatic <br /> Q Other(Specify) <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: 4 psi <br /> Piping Run# 1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: ERP <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: (I <br /> Product Stored: L <br /> Method and location of <br /> piping-run isolation: ,5,97- boor <br /> Wait time between applying <br /> pressure starting test: <br /> S kn r <br /> Test Start Time: 1,5 -0 <br /> Initial Reading(R.) -5 ps 1. <br /> Test End Time: <br /> Final Reading(RF): ,S G <br /> Test Duration: ` f <br /> Change in Reading(RF- R.): �t <br /> Pass I Fail Threshold or Criteria: Q S G <br /> TEST RESULT: PASS Q FAIL PASS ❑ FAIL ❑ PASS ❑ FAIL PASS ❑ FAIL <br /> Comments— (include information on repairs made prior to testing; and recommended follow-up for failed tests) <br /> T e r�T roti_ .?e / /Q R.,-' we.-I <br /> 11 Pole <br /> 6t s <br />