Laserfiche WebLink
Page_tom/ of Jr <br /> SWRCB, MAY 2002 <br /> 6. PIPING SUMP TESTING Professional Engineer <br /> Sump Manufacturer C1 Industry Standard 13 Engineer <br /> Test Method Developed by: Q Other(Specify) <br /> C1Vacuum 2L Hydrostatic <br /> Cl Pressure <br /> Test Method' ❑ Other(Specify) <br /> Equipment Resolution: .OS gph <br /> Test Equipment Used: VMI <br /> Sump# fpypfj Sump#�. sfbpT�J <br /> Sump# Sump# <br /> Sump Diameter ` <br /> Sump Depth <br /> r? <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical-Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested: <br /> All <br /> Does turbine shut down when sump e <br /> sensor detects either product or water? <br /> Turbine shutdown response time: C C <br /> Is system programmed for <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ <br /> vamum/water&starting test: <br /> OD <br /> Test Start Time: <br /> Initial Reading(Rr) ++^ <br /> Test End Time: C1 LIS C <br /> bre/ <br /> Final Reading(Rr): <br /> Test Duration: <br /> Change in Reading(RF-Rr): sir 105 <br /> dS Ph <br /> Pass/Fail Threshold or Criteria: PASS/ 95 -1 P FAIL f�y PASS ❑ FAIL ❑ PASS ❑ FAIL C] PASS [3 FAIL <br /> ❑ <br /> TEST RESULT: � No NA ❑Yes C]No❑NA ❑Yes❑No❑NA <br /> A <br /> Was sensor removed for testing? (�yes C]NO❑NQqY�❑ ❑ ❑NA ❑Yes❑No❑NA <br /> Was sensor properly replaced& Yes❑No NA 0 yes No C]NA ❑Yes❑No <br /> verified functional after testing? ❑ <br /> COrn[r►ents— (include information on repairs made prior 10 testing, and recommended follow-up for failed tests) <br />