My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
COMPLIANCE INFO 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:06 PM
Creation date
11/8/2018 9:44:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2467\PR0231818\COMPLIANCE INFO 2002 - 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx.32' Approx.32' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test boot at Test boot at <br /> i in -run isolation: Piping Sump#1 Piping Sump#2 <br /> Wait time between applying 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 8:40 8:45 <br /> Initial Reading(111): 3 Psi 3 Psi <br /> Test End Time: 9:40 9:45 <br /> Final Reading(RF): 3 Psi 3 Psi <br /> Test Duration: I Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.