My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
COMPLIANCE INFO 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:06 PM
Creation date
11/8/2018 9:44:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2467\PR0231818\COMPLIANCE INFO 2002 - 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1 Sump#2 Sump# Sump# <br /> Sump Diameter: 4211 Octagon 42"Octagon <br /> Sump Depth: 36" 36" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 15" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 8" 8" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Line 14" Water Line 17" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No ❑NA X Yes ElNo L1NA <br /> product and water <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe X Yes ❑No ❑NA X Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be Yes X No ❑NA Yes X No ❑NA <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 8:50 8:55 <br /> Initial Reading(R,): .001 .001 <br /> Test End Time: 9:20 9:25 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-Rj): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail ❑Pass ❑Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? X Yes f::No ❑NA X Yes ❑No ❑NA ❑Yes ❑No G NA Yes No NA <br /> Was sensor properly replaced and X Yes No ❑NA X Yes ❑No ❑NA ❑Yes ❑No C NA ❑Yes —No NA <br /> verified functional after testin 7 <br /> Comments—(include information on repairs made prior to testing, and recommendedfollaw-upforfailed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.