My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
COMPLIANCE INFO 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:06 PM
Creation date
11/8/2018 9:44:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2467\PR0231818\COMPLIANCE INFO 2002 - 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution:.002 <br /> UDC#1&2 UDC#3&4 UDC# UDC# <br /> UDC Manufacturer: APT APT <br /> UDC Material: Poly Plastic Poly Plastic <br /> UDC Depth: 33" 33" <br /> Height from UDC Bottom to Top 10 %:" 10 %:" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 9" 12" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested Water Line 12%s" Water Line 12 %" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both X Yes No ❑NA X Yes No ❑NA <br /> roduct and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail- X Yes LlNo ❑NA X Yes ❑No ❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be Yes X No ❑NA Yes X No ❑NA <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 9:00 9:05 <br /> Initial Reading .001 .001 <br /> Test End Time: 9:30 9:35 <br /> Final Reading(R,): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Chane in Reading(R,-R,): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes _I No ❑NA ❑Yes i No NA S:Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.