Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: `/ ® Check this box if tank gaLs used only for inventory control. <br /> ❑ Check this box if no tank gATging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Ves ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Ves ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> As Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followin checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ®3 g.p.h.; [10 1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> rElYes ❑ No' Was the testing apparatus property calibrated? <br /> Yes ❑ No' For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> N/A <br /> YesNo' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> N/A <br /> Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ <br /> Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> DSL E 100 3 26 13 PASS <br /> DSL W 130 4 25 11 PASS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />