Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address. &IJ TRUCKING CO. 2431 EAST MARIPOSA ROAD STOCKTON CA 85205 <br /> MARIPOSA ROAD <br /> �y <br /> A=ANNULAR , <br /> FENCE . . . . . F=PILL <br /> . V=VENTS <br /> . . . . . . . . . . . FILL. . . . . . . . . . . . . . . . <br /> . ANNULAR . . . . . . . . . . . . <br /> . O . . TK 1. NORTH . . . . . . . . . . . . . . . . . <br /> . VENTS . . . . . . . . . . . <br /> .9.. . O. O 0 . . .TK 2. .SOUTH . . . . . . . . . . . . . . . . <br /> . . . . . Eit <br /> . 3 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . DISPATCH .OFFICE. . . . . . . . - <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . RESTROO <br /> INCON TS 1001. . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . .SHOP . . . . . <br /> Date map was drawn: 5/18111 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />