My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:44 PM
Creation date
11/8/2018 9:46:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\COMPLIANCE INFO 2017 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 - PRESENT
QuestysRecordDate
6/5/2018 9:28:19 PM
QuestysRecordID
3909979
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*9CE r <br /> AUG 18 2017 <br /> ENV1R0NME'\1T1'1- HEALTH <br /> Item#209 CCR 2715(c)designated operator did not inspect all required items anAV inspection <br /> reports not completed. The D.O. failed to document all the alarms from the alarm history on the <br /> 8/16/16 and 4/14/17 D.O. monthly inspection reports and failed to check that they were responded <br /> to appropriately. The missing alarms include: Tl: unleaded overfill alarm on 8/5/16; and Q4 diesel <br /> periodic line fail alarm on 4/8/17. During the monthly inspection, the D.O. shall review the alarm <br /> history for the previous month, check that each alarm was documented and responded to <br /> appropriately and attach a copy of the alarm history with documentation taken in response to any <br /> alarms to the monthly report. <br /> The D.O. did not print the alarm histories from the veeder root panel for L8, L26, S2, S3, S5 and <br /> S7 during the D.O. monthly inspection on 9/20/16 and did not print the alarm histories for L25 and <br /> L27 during the D.O. monthly inspection on 7/14/17. Attached are copies of alarm histories from <br /> the 9-20-16 and 7-14/17 D.O.monthly inspections. <br /> We have reviewed this violation with Service Station Systems, our company designated operator, <br /> they will address with their designated operators the importance of checking and documenting <br /> these items. <br /> Item#316 HSC 25290.1(c3), 25290.2(c3) Secondary containment not constructed to prevent water <br /> intrusion(after July 2003). The service technician removed approximately one cup of liquid from <br /> each of the STP sumps and approximately one-quarter cup of liquid from the 87-product full sump, <br /> approximately one cup of liquid from the 91-product fill sump and a trace of liquid from the diesel <br /> fill sump then retained the sensors to their proper locations. This was corrected on site by the <br /> service technician as noted in the inspection report. <br /> Item#319 CCR 2635(b)No spill bucket, failed to contain five gallons,or failed to provide a means <br /> to keep it empty. Upon receipt of this report we contacted our designated operator Service Station <br /> Systems to repair. This repair was completed on 8/4/17. Attached are copies of the spill bucket <br /> testing report and invoice showing work completed. <br /> 1. Overall inspection comments: <br /> a.Communication is under dispenser containment(UCD) 5-6 was verified by <br /> opening a port located near the brine reservoir. Communication must be <br /> tested away from the brine reservoir. <br /> 1. Service Station Systems completed this repair on 8/14/17 <br /> Removed plug in bottom port of UDC, Installed ball valve <br /> into existing port. No permit needed. Communication can <br /> now be tested away from the reservoir exactly how it is <br /> tested in the other UDC's at this site. No permit needed, port <br /> was already existing. Just added ball valve. <br /> b. A boot in the 87-product submersible turbine pump sump and a boot in <br /> the 91-product fill sump were broken. <br /> 1. Service Station Systems completed these repairs on 8/14/17. <br /> Installed one test boot in the 87 STP sump. Installed one test <br /> boot in the 91 Fill sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.