Laserfiche WebLink
----- - -- <br />SCALE: V=20' -O" <br />2Q 0 20 40 <br />DRAINAGE KEY: <br />20 INSTALL THREE (3) CARTRIDGE "STORMWATER MANAGEMENT" ASSEMBLY PER DETAIL 1, <br />SHEET C4-2. <br />21 CONSTRUCT "CHRISTY" U21 CATCH BASIN W/ TRAFFIC RATED GRATE (OR APPROVED EQUAL) <br />PER DETAIL 2, SHEET C4-2 <br />22 CONSTRUCT "CHRISTY" U21 CATCH BASIN W1 BOLT DOWN LID (OR APPROVED EQUAL) PER <br />DETAIL 2, SHEET C4-2 <br />23 CONSTRUCT PRIVATE 12" PVC STORM DRAIN PER CITY OF STOCKTON STANDARD DRAWINGS <br />AND SPECIFICATIONS <br />24 CONSTRUCT 8" PVC STORM DRAIN PER CITY OF STOCKTON STANDARD DRAWINGS AND <br />SPECIFICATIONS <br />25 CONSTRUCT 8" PVC SDR35 STORM DRAIN PER CITY OF STOCKTON STANDARD DRAWINGS <br />AND SPECIFICATIONS <br />26 CONSTRUCT 4" PVC STORM DRAIN FROM TRENCH DRAIN <br />27 CONSTRUCT 3" PVC SDR35 STORM DRAIN FROM KIOSK ROOF DRAINIDOWNSPOUT TO 8" PVC <br />SDR35 STORM DRAIN <br />28 CONSTRUCT 3" PVC SDR35 STORM DRAIN FROM CANOPY DOWNSPOUT TO 8" PVC SDR35 <br />STORM DRAIN <br />29 CONSTRUCT STORM DRAIN CLEAN OUT PER DETAIL 5, SHEET C4-1 <br />30 INSTALL 6" "ALHAMBRA FOUNDRY COMPANY" TRENCH DRAIN WITH GRATE, TYPE 'A-2446' <br />31 INSTALL 10" "NDS" ROUND CATCH BASIN #10605 ON 8" PVC RISER <br />rRoiWT <br />Ge to <br />Basis of Bearings: <br />THE BEARINGS USED ON THIS DRAWING ARE BASED UPON THE CENTERLINE OF MORADA <br />LANE, TAKEN AS N89"54'06"W, AS SHOWN ON THE MAP OF LA MORADA, UNIT NUMBER 12, <br />FILED IN BOOK 37 OF MAPS AND PLATS, PAGE 72, SAN JOAQUIN COUNTY RECORDS. <br />Bench Mark: <br />THE BASIS FOR THE ELEVATIONS SHOWN ON THIS DRAWING IS A BRASS DISK MARKING CITY <br />OF STOCKTON MONUMENT STAMPED "9N-22" AT SOUTH END OF THE SOUTHEAST ONE OF <br />THREE TRAFFIC MEDIAN ISLANDS AT THE INTERSECTION OF MORADA LANE AT HIGHWAY 99 <br />WEST FRONTAGE ROAD. <br />ELEVATION = 39,40', NAVD88 DATUM <br />DIAL TOLL FREE <br />1-800-227-2600 <br />AT LEAST TWO DAYS <br />BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT OF CALIFORNIA <br />Grading and Drainage Notes: <br />1. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE INDUSTRIAL SAFETY REGULATIONS. <br />THE CITY OF STOCKTON AND ITS OFFICIALS, THE ENGINEER, AND THE OWNER SHALL NOT h s <br />BE RESPONSIBLE FOR ENFORCING SAFETY REGULATIONS. <br />r <br />N � { <br />o N <br />2. THE CITY INSPECTOR, ACTING ON BEHALF OF THE CITY ENGINEER, MAY REQUIRE <br />REVISIONS IN THE PLANS TO SOLVE UNFORESEEN PROBLEMS THAT MAY ARISE IN THE <br />FIELD. ALL REVISIONS SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT <br />ENGINEER_ y 4 <br />N- <br />3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PLACEMENT OF ALL SAFETY <br />DEVICES SUCH AS FENCING BARRICADES, SAFETY TAPE, ETC., AND HE SHALL FOLLOW <br />ALL APPLICABLE INDUSTRIAL SAFETY REGULATIONS. THE CITY OF STOCKTON AND ITS '' _ OR <br />OFFICIALS, THE ENGINEER, AND THE OWNER SHALL NOT BE RESPONSIBLE FOR <br />ENFORCING SAFETY REGULATIONS. <br />4. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OR PROPER RESETTING OF <br />3 rt <br />ALL EXISTING MONUMENTS AND OTHER SURVEY MARKERS. ANY SURVEY MONUMENTS <br />DESTROYED BY THE CONTRACTOR SHALL BE REPLACED IN ACCORDANCE WITH THE <br />STATE LAND SURVEYOR'S ACT AT THE CONTRACTOR'S OWN EXPENSE. <br />5. ALL UTILITIES SHOWN ARE ACCURATE TO THE EXTENT OF AVAILABLE RECORDS AND FOODS <br />KNOWLEDGE. THE CONTRACTOR HAS THE TOTAL RESPONSIBILITY TO VERIFY THE <br />LOCATION OF EXISTING UNDERGROUND UTILITIES WITH THE UTILITY COMPANIES AND THE <br />OWNER AND TO NOTIFY THEM WHEN WORKING IN THEIR PROXIMITY_ 1 <br />6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT "UNDERGROUND <br />r:. <br />SERVICE ALERT" AT 1-800-227-2600 FOR LOCATION OF POWER, GAS, OIL, CAN, WATER, <br />SEWER, AND TELEPHONE UNDERGROUND FACILITIES. THE CONTRACTOR WILL ALSO BE s :' <br />RESPONSIBLE FOR CONTACTING THE APPROPRIATE AGENCIES FOR THE LOCATION OF y <br />ALL UNDERGROUND FACILITIES. <br />7. THE CONTRACTOR SHALL POTHOLE AND VERIFY ALL EXISTING UTILITY LOCATIONS AND <br />ELEVATIONS PRIOR TO COMMENCEMENT OF WORK IN THAT AREA - <br />500 WEST CAPITAL AVENUE <br />8. THE CONTRACTOR SHALL OBTAIN PERMISSION TO ENTER UPON ADJOINING PROPERTY TO y WEST SACRAMENTO, CA <br />CONSTRUCT IMPROVEMENTS OR TO GRADE PRIOR TO CONSTRUCTION. THE CITY 95605 <br />ENGINEER DOES NOT AUTHORIZE ENTRY PER THESE APPROVED PLANS- <br />P.O. BOX 15618 SACRAMENTO, CA <br />9. ANY DEVIATION FROM THESE PLANS WITHOUT PRIOR APPROVAL FROM THE DESIGN 95852 <br />ENGINEER SHALL BE AT THE CONTRACTOR'S OWN RISK AND EXPENSE. <br />10. ALL GRADING SHALL BE CONDUCTED IN ACCORDANCE WITH CHAPTER 33 OF THE U.B.C. REVISIONS <br />AND CITY ORDINANCE_ <br />11. EARTHWORK: CUT: CY FILL: CY <br />(FOR OVER -EX) CUT AND FILL QUANTITIES ARE TO BE USED FOR DETERMINING PERMIT <br />FEES ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ACTUAL <br />EARTHWORK QUANTITIES FOR BIDDING PURPOSES. EDA DOES NOT, EXPRESSLY OR BY <br />IMPLICATION EXTEND ANY WARRANTY FOR EARTHWORK QUANTITIES. <br />12, THE CONTRACTOR SHALL PROVIDE DUST CONTROL DURING ALL PHASES OF THE WORK. <br />13. ALL GRADING SHALL BE CONDUCTED IN ACCORDANCE WITH CHAPTER 33 OF THE U.B.C. / <br />AND THE RECOMMENDATIONS OF THE SOILS REPORT PREPARED BY: KLEINFELDER, INC. , <br />DATED: MARCH 2, 2005 , JOB NUMBER: 38720.G02 , WHICH SHALL BECOME APART OF <br />THE PLANS. <br />14. OWNER SHALL CONTRACT WITH A CERTIFIED SOILS ENGINEER FOR INSPECTION AND <br />COMPACTION TESTING DURING ROUGH AND FINISH GRADING OPERATIONS. <br />15. ALL PUMPING SOILS SHALL BE REMOVED AND REPLACED AS DIRECTED BY THE ENGINEER <br />REGARDLESS OF COMPACTION TESTS RESULTS. <br />design <br />16. MATERIAL TO BE USED AS BACK FILL OR EMBANKMENT SHALL BE APPROVED BY THE professionals <br />SOILS ENGINEER AND BE FREE OF OBJECTIONABLE MATERIAL SUCH AS TREES, STUMPS, <br />ROOTS, LOGS OR OTHERWISE DELETERIOUS MATERIAL. <br />17. COMPACTION TEST SHALL BE MADE ON SUB -GRADE MATERIAL AND MATERIAL PLACED AS civil engineers . land surveyors . land planners <br />SPECIFIED BY THE ENGINEER AND AS OUTLINED IN THE SOILS REPORT. SOIL TESTS1548 Santa barbas st . san luis obispo, ca 93401 <br />SHALL BE MADE PRIOR TO THE PLACING OF STRUCTURAL MATERIAL_ ph: 8051549-8658 " email: eda@edainc.com <br />18. THE PAVING STRUCTURAL SECTION SHALL BE BASED ON SOILS TEST MADE AT THE TIME FESS 1� <br />OF CONSTRUCTION TO DETERMINE "R" VALUE AND ON A TRAFFIC INDEX OF 6.5 FOR ALLP� P . <br />PAVED AREAS. <br />19. SAW -CUT OF EXISTING PAVEMENT SHALL BE ALONG A NEAT VERTICAL LINE PARALLEL TO <br />CENTERLINE WHERE POSSIBLE AS DIRECTED BY THE ENGINEER OF WORK. APPLY Lic. No. 26,431 <br />PAINT BINDER OF ASPHALTIC EMULSION TO ALL VERTICAL SURFACES OF EXISTING * Expires 3131106 <br />PAVEMENT TO RECEIVE ADDITIONAL MATERIAL AND/OR AS DIRECTED BY THE ENGINEER CIVIL <br />OF WORK. aF OF <br />CA0FCg <br />20. AGGREGATE BASE MATERIAL SHALL CONFORM TO THE REQUIREMENTS FOR AGGREGATE ; <br />BASE AS SPECIFIED IN SECTION 26 OF THE STATE STANDARD SPECIFICATIONS. ANY SHEET TITLE <br />WORK DONE THAT DOES NOT MEET OR EXCEED THE MINIMUM SPECIFICATION WILL BE <br />REJECTED. <br />21. ASPHALT CONCRETE PAVING SHALL CONFORM TO THE REQUIREMENTS FOR ASPHALT ,,. s G A R `A D I N G AND <br />CONCRETE AS SPECIFIED IN SECTION 39 OF THE STATE STANDARD SPECIFICATIONS_ ANY <br />WORK DONE THAT DOES NOT MEET OR EXCEED THE MINIMUM SPECIFICATIONS WILL BE p N AG PLAN <br />REJECTED. <br />22. PROVIDE EROSION CONTROL PLANTING FOR ALL FRESH CUT AND FILL SLOPES AND ON <br />ALL DISTURBED SURFACES OTHER THAN PAVED OR GRAVEL SURFACES. PERMANENT <br />VEGETATION SHALL BE ESTABLISHED PRIOR TO FINAL INSPECTION, <br />23. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PLACEMENT AND MAINTENANCE OF ALL <br />EROSION CONTROL DEVICES AS SPECIFIED BY THE ENGINEER OF WORK AND APPROVED <br />BY THE CITY ENGINEER. THESE DEVICES SHALL BE IN PLACE OR BE READY TO PLACE <br />FROM NOVEMBER 15 TO APRIL 15. IN THE EVENT THAT THE DEVICES ARE NOT <br />PERMANENTLY IN PLACE THEY SHALL BE PLACED IN THE EVENT FORECAST FOR RAIN <br />EXCEEDS 30%_ AN EMERGENCY CREW SHALL BE AVAILABLE 24 NRS A DAY IN THE EVENT <br />AN EROSION PROBLEM SHOULD OCCUR. A RESPONSIBLE PERSON AND HIS PHONE <br />NUMBER SHALL BE NAMED HERE UPON. <br />NAME: PAT FERRINGTON <br />PHONE NUMBER: (916) 376-6697 <br />�J1L. <br />24. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT THE ENGINEER OF RECORD AND; <br />THE CITY INSPECTOR AT LEAST 24 HOURS PRIOR TO POUR OF CONCRETE IN ORDER TO <br />VERIFY LINE AND GRADE OF THE FORM WORK AND SUBGRADE. IN THE EVENT THE ;fw , PROJECT NAME <br />CONTRACTOR POURS CONCRETE WITHOUT PROPER NOTIFICATION HE IS RESPONSIBLE <br />FOR REMOVAL AND REPLACEMENT COSTS OF THE IMPROVEMENTS CONSTRUCTED IN THE <br />EVENT THE IMPROVEMENTS ARE REJECTED. ALL IMPROVEMENTS CONSTRUCTED RAL EY'S #3�6 <br />WITHOUT PROPER FORM INSPECTION WILL BE AT THE CONTRACTOR'S RISK. <br />25. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ITEMS SHOWN ON ALL SHEETS. r' FUEL CENTER <br />General Notes: <br />1. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN IS BY OTHERS. EDA <br />ASSUMES NO RESPONSIBILITY FOR PRIOR SURVEYS, EASEMENTS, DOCUMENTS, <br />EXIST EXISTING <br />e <br />ETC., RELATING TO THIS PROPERTY, OR ENCROACHMENTS INCLUDING, BUT NOT <br />E <br />9is <br />LIMITED TO, WALLS, FENCES, BUILDINGS, TREES OR UTILITIES. <br />FS FINISHED SURFACE <br />2. THE CONTRACTOR SHALL VERIFY EXISTING GRADES AS SHOWN HEREON PRIOR TO <br />r. <br />COMMENCEMENT OF CONSTRUCTION. IF SIGNIFICANT DISCREPANCIES EXIST <br />HP HIGH POINT <br />FRONTAGE ROA© & <br />BETWEEN "AS -BUILT" INFORMATION AS SHOWN HEREON AND FIELD CONDITIONS <br />INV INVERT,., <br />THEN THE CONTRACTOR SHALL STOP ALL SURFACE WORK AND CONTACT THE <br />,` <br />MORAIDA LANE <br />DESIGN ENGINEER FOR REVISIONS. <br />TC TOP OF CURB <br />STOCKTON, CALIFORNIA <br />3. THESE PLANS REFERENCE THE CIVIL PLANS FOR EVERGREEN-MORADA RANCH <br />TG TOP OF GRATE <br />- <br />RETAIL CENTER, BY: <br />PROPOSED SPOT GRADE <br />AMS ASSOCIATES, INC. <br />1350 TREAT BOULEVARD, SUITE 250 <br />' <br />PROJECT NO_ <br />WALNUT CREEK, CA 94596 <br />2.3208.000 <br />TELEPHONE: (925) 943-2777 <br />FAX: (925) 943-2778N, <br />,:fit,,. <br />r <br />DRAWN 13Y <br />Grading Legend: <br />EXIST EXISTING <br />e <br />Q SCALE <br />FF FINISHED FLOOR <br />FL FLOW LINE <br />9is <br />AS SHOWN <br />FS FINISHED SURFACE <br />GB GRADE BREAK <br />HP HIGH POINT <br />INV INVERT,., <br />DATE <br />SD STORM DRAIN <br />y 23 JUNE 2045 <br />TC TOP OF CURB <br />TG TOP OF GRATE <br />- <br />PROPOSED SPOT GRADE <br />a PAGE NO. <br />EXISTING SPOT GRADE <<; <br />C3� 1 <br />,, SHEET OF <br />