Laserfiche WebLink
Pacific Gas and Electric Company Pipe Line Operations George W.Rowe <br /> Northern Area Manager t <br /> a�asi P� TiNQ�S P.O.Box 2505 <br /> Antioch,CA 94509 a v 1d1 L �1 <br /> �Q 41517570170 <br /> October 18, 1988 <br /> San Joaquin Local Health District C: iEdP" I`c�i21i <br /> P.O. Box 2009 <br /> r Stockton, CA 95201 <br /> i, Attn: Jaime Favila <br /> Dear Mr. Favila: <br /> Attached you will find Pacific Gas and Electric Company' s <br /> Monitoring Plan and Emergency Response Plan for the fuel <br /> tanks to be installed at our Tracy Maintenance Station on <br /> Patterson Pass Road and Highway 205 in Tracy. <br /> Since the installation of our tanks is contingent upon your <br /> acceptance of these plans, we request your approval to <br /> proceed with our construction as soon as possible. <br /> If you have any questions regarding these plans please do <br /> not hesitate to contact Mr. Thom Trimble at (415) 779-4801. <br /> Sincerely, <br /> r <br /> 'a <br /> TCT:med <br /> cc: Paradiso Construction <br /> 9220 G Street <br /> Oakland, CA 94603 <br /> Attn: Jerri <br /> Attachment <br />