Laserfiche WebLink
SWRCB,January 2002 • • Page_�_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: D Pressure 0 Vacuum Hydrostatic <br /> D Other(Spec) <br /> Test Equipment Used: CAD �y F 1, Equipment Resolution: <br /> Sump# Sump# — Sump# Sump# <br /> Sump Diameter: Z <br /> d 7y <br /> Sump Depth: n (Q tt <br /> Sump Material: A ef-i A f -I <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: �j 3 <br /> Condition of sump prior to testing: Cle y ii Cle"n <br /> Portion of Sump Tested' l)u bo Hr",) <br /> Does turbine shut down when <br /> sump sensor detects liquid(both T Yes %No DNA y Yes $No DNA D Yes 0 No DNA D Yes D No DNA <br /> product and water . <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown? V yes []No DNA V Yes 0 No DNA 0 Yes D No DNA D Yes D No DNA <br /> Was fail-safe verified to be <br /> operational?* 1Kyes 0 No DNA IYes D No DNA D Yes D No DNA 0 Yes 0 No D NA <br /> t Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: l U k h 1 h Q «;h <br /> Test Start Time: luo 0 <br /> Initial Reading(Rj): '04)1 .Ud 1 <br /> Test End Time: 11 :00 <br /> Final Reading(RF): ,VU l . 0 <br /> Test Duration: 30 3 U vh ,n <br /> Change in Reading(RF-RJ: & . UD <br /> Pass/Fail Threshold or Criteria: 0c)13- U&S <br /> Test Result: Pass D Fail D Pass jFail D Pass E Fail D Pass D Fail <br /> Was sensor removed for testing? $Yes D No DNA $Yes D No DNA []Yes D No DNA 0 Yes D No DNA <br /> Was sensor properly replaced and �yes D No DNA Ves D No DNA D Yes 0 No D NA D Yes 0 No D NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up forfailed tests) <br /> Uhuhle hL, dy 10,411 SNt' Py r-P5 lip -feg3l- RecA <br /> 1 <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-l60) <br />