Laserfiche WebLink
SWRCB,January 2002 • • Page 3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 1P Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Z Piping Run# 1 Piping Run# <br /> Piping Material: FiberClevii F Py Cl 0t SS <br /> Piping Manufacturer: <br /> Piping Diameter: 3"SPc Ic�ar <br /> c• 3 Slec�9.�c+/l <br /> Length of Piping Run: LQ/ <br /> Product Stored: S" z 3e <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail 0 Pass 0 Fail ❑ Pass -<❑Fait ❑ Pass ❑Fail <br /> Comments —(include information on repairs madepriorto testing, and recommendedfol�lo/w-up for failed tests) <br /> Untohle +c., +e,54- Ilo -� e4+ l7! G Ih Sgen�+ Gr VO[. <br /> 0 <br /> (Aho W4 + ee .Ilr-aJ '44 161e PhHf-eo <br /> rI'm f <br /> v Skh"n04�icf-urtr Q 'uvhelPr <br />