My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INTERNATIONAL
>
1115
>
2300 - Underground Storage Tank Program
>
PR0231707
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:37:00 PM
Creation date
11/8/2018 9:46:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0231707
PE
2361
FACILITY_ID
FA0003948
FACILITY_NAME
PG&E TRACY MAINTENANCE STATION
STREET_NUMBER
1115
Direction
N
STREET_NAME
INTERNATIONAL
STREET_TYPE
PKWY
City
TRACY
Zip
95377
APN
209-080-06
CURRENT_STATUS
02
SITE_LOCATION
1115 N INTERNATIONAL PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS3\M\MOUNTAIN HOUSE\24081\PR0231707\COMPLIANCE INFO 1986-2003.PDF
QuestysFileName
COMPLIANCE INFO 1986-2003
QuestysRecordDate
8/11/2017 9:19:31 PM
QuestysRecordID
3574393
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • • Page 3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 1P Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Z Piping Run# 1 Piping Run# <br /> Piping Material: FiberClevii F Py Cl 0t SS <br /> Piping Manufacturer: <br /> Piping Diameter: 3"SPc Ic�ar <br /> c• 3 Slec�9.�c+/l <br /> Length of Piping Run: LQ/ <br /> Product Stored: S" z 3e <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail 0 Pass 0 Fail ❑ Pass -<❑Fait ❑ Pass ❑Fail <br /> Comments —(include information on repairs madepriorto testing, and recommendedfol�lo/w-up for failed tests) <br /> Untohle +c., +e,54- Ilo -� e4+ l7! G Ih Sgen�+ Gr VO[. <br /> 0 <br /> (Aho W4 + ee .Ilr-aJ '44 161e PhHf-eo <br /> rI'm f <br /> v Skh"n04�icf-urtr Q 'uvhelPr <br />
The URL can be used to link to this page
Your browser does not support the video tag.