Laserfiche WebLink
SWRCB,January 2002 N%./ 1./ Page 2. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑X Tank Manufacturer Industry Standard ❑ Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: Pressure Vacuum ❑ Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: IEquipment Resolution: <br /> Piping Run# 1 UNL REG PIPIng Run# 2 SUP SUP Piping Ran# Piping Run# <br /> Piping Material: fiberglass fiberglass <br /> Piping Manufacturer: smith smith <br /> Piping Diameter: 31- 311 <br /> Length of Piping Run: 4 0' 40- <br /> Product <br /> 0-Product Stored: UNLEADED SUPREME <br /> Method and location of sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min <br /> starting test: <br /> Test Start Time: 8:36 8:38 <br /> Initial Reading(Ri ): 3psi 3psi <br /> Test End Time: 9:36 9:38 <br /> Final Reading(RF ): 3psi 3psi <br /> Test Duration: lhr 1hr <br /> Change in Reading(RF-R[ ): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: Pass ❑ Fail M Pass ❑ Fail E Pass E] Fail 0 Pass E] Fail <br /> Comments - (include infoimlation on repairs made prior to testing, and recommended.follom,-upforfailed tests) <br />