My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
standpipe).Record this measurement as Initial Internal Diameter 15.4.12.When the tank is delivered,check the monitoring-fluid <br /> on the Tank Installation Checklist,SECTION 4, level and record it on the shipping/receiving paperwork and Tank <br /> 14.3.6.For subsequent measurements of the internal diameter, Installation Checklist(See FIGURE 15-1.) <br /> repeal Points 14,3.1,through 14.3.5.When the measurement is the i I <br /> final diameter measurement,record this measurement as Final n�rrvw, <br /> Internal Diameter on the Tank Installation Checklist,SECTION 4. I <br /> 1 MfmNO:/vj Ilovi ' <br /> 14.4.CALCULATION AND COMPARISON <br /> 14.4.1.To get the deflection measurement at any time,subtract <br /> the current internal-diameter measurement from the initial internal- <br /> diameter measurement. <br /> I <br /> 14.4.2.Compare this measurement to the allowable defections FIGURE 15.1 <br /> shown in Lire table on the Tank Installation Checklist,SECTION 4. <br /> 14.4.3.Vertical deflection in excess of this measurement indicates 15.4.1.3.It monitoring fluid's not in the reservoir,call the UST <br /> improper installation and voids the tank warranty, coordinator at the Xerxes plant nearest you. <br /> 15.4.1.4.The TRUCHEK system enables the owner to have <br /> • • continuous monitoring or to conduct a tank-tightness test. <br /> 15.1.SINGLE-WALL TANK TRUCHEK meets the EPA criteria for tank-tightness testing.(See <br /> the Xerxes TRUCHEKbrochure.) <br /> 15.1.1.Single-wall tank installations may require release detection ------».� <br /> monitoring,which can ioduria inventory control automatic tank 15.4.1.5 7n a tank with the inters[ce BUed with monito ng h d. <br /> gauging,vapor monitoring or groundwater monitoring Xerxes recommends using a nonmetalic�the reservoir, <br /> 15.1.2.Check with federal,slate and local officials for require- <br /> ments in your area. <br /> 15.1.DOUBLE-WALL TANK MonlWrig fluid should not be present In the standpipe except <br /> riming a TRUCHEK test(See the Xerxes TRUCHEK brochure.) <br /> 15.2.1.A Xerxes double-wall tank has an interstitial space Monitoring fluid in the standpipe may create excessive pressure <br /> between the wall of the primary(internal)tank and the wall of the on the intersd6al space and may result in tank damage. <br /> secondary(external)tank for the containment and detection of <br /> leaked product from the primary tank. 15.41.6.The monitoring-Quid level may fluctuate during shipping and <br /> installation.Do not add monitoring fluid until after tank burial is <br /> 15.2.2.The tank,as supplied,will have a minimum of one monitor completed and the monitoring system is set up. <br /> fitting that provides access into the interstitial space. <br /> 15.4.1.7.During the installation process,the monitodrg-fluid level in <br /> 15.3.TANK WITH A DRY INTERSTITIAL SPACE the reservoir will rise naturally under various conditions: <br /> 15.3.1.The monitoring system and method is the responsibility of • preinstallation air test <br /> the tank owner and/or operator. • rise in groundwater level <br /> 15.3.2.Assfe electronic or mechanical system should be used to backfill compaction <br /> defect either product or incoming water. ballasting. <br /> 15.4.1.8.If a tank is sloped,rhe reservoir will be at the high end. <br /> 15.3.3.The monitoring system should detect leakage near the <br /> bottom of the tank. 15.4.1.9,Check and record the morntoring•fluid level during the <br /> 15,14.Monitoring can be done through the monitor fitting provided, <br /> installation process.(See Tank Installation Checklist.) <br /> 15.5.5.If a double-wall lank is sloped,the monitor should be at the 15.4.1.10.Any monAoring-fluid leaks will be detected during the <br /> preinstallation air test(See SECTYON 3.) <br /> low end. <br /> 15.4.TANK WITH A WET INTERSTITIAL SPACE 15A1.SETTING THE LEVEL OF THE MONITORING FLUID <br /> 15.4,1.GENERAL 15.4.2.1.After backfilling and top-slab placement is completed, <br /> check the level of the monitoring fluid in the reservoir and set the <br /> 15.4.1,1.With a wet interstitial monitoring system(TRUCHEKe), monitoring fluid to the proper level. <br /> the interstitial space is typically filled with monitoring fluid at the <br /> manufacturing facility. <br /> CAUTION <br /> CAUTION Failure to set die monitoring fluid level properly may lead to false <br /> All wet interstitial spaces must be vented to atmosphere.(See alarms. <br /> SECTION 11.4.) <br /> E ' d L PON 8002 'Z ' �00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.