My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 5 4,5 <br /> S W RCB,January 2002 Page 3--of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer 2Industry Standard 0 Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: ja Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(wady) <br /> Test Equipment Used: 4in. DIAL GAUGE Equipment Resolution: .5% <br /> Piping Run 1 Piping Run q Piping Run# Piping Run A <br /> Piping Material: <br /> Piping Manufacturer. U' n <br /> Piping Diameter: e� <br /> Length of Piping Run: <br /> Product Stored: Un f ) <br /> Method and location of <br /> piping-run isolation: t)r15oM I <br /> Wait time between applying <br /> pressurclvaeuum/water and <br /> starting teat: .30 rK,n Vh <br /> Test Start Time: :30M 'f ;Xl >— - <br /> InitialReading(Rj: 54r; 5 <br /> Test End Time: /; O M 1 :30 Ir <br /> Final Reading(Rr): J S• <br /> Test Duration: ylOU4 oU <br /> Change in Reading(Rr Rt): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: .Pass 0 Fall )?ass 0 Fail 0 Pass 0 Fall O Pass Opal) <br /> COMM ent$—finclude Information on repairs made prior to festin¢ and recommended follow-un)rorjalfed fess) <br />
The URL can be used to link to this page
Your browser does not support the video tag.