Laserfiche WebLink
i 5 4,5 <br /> S W RCB,January 2002 Page 3--of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer 2Industry Standard 0 Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: ja Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(wady) <br /> Test Equipment Used: 4in. DIAL GAUGE Equipment Resolution: .5% <br /> Piping Run 1 Piping Run q Piping Run# Piping Run A <br /> Piping Material: <br /> Piping Manufacturer. U' n <br /> Piping Diameter: e� <br /> Length of Piping Run: <br /> Product Stored: Un f ) <br /> Method and location of <br /> piping-run isolation: t)r15oM I <br /> Wait time between applying <br /> pressurclvaeuum/water and <br /> starting teat: .30 rK,n Vh <br /> Test Start Time: :30M 'f ;Xl >— - <br /> InitialReading(Rj: 54r; 5 <br /> Test End Time: /; O M 1 :30 Ir <br /> Final Reading(Rr): J S• <br /> Test Duration: ylOU4 oU <br /> Change in Reading(Rr Rt): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: .Pass 0 Fall )?ass 0 Fail 0 Pass 0 Fall O Pass Opal) <br /> COMM ent$—finclude Information on repairs made prior to festin¢ and recommended follow-un)rorjalfed fess) <br />