Laserfiche WebLink
SWRCB,January 2002 Page-f-_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer R Industry Standard C Professional Engineer <br /> 0 Other(S ec& <br /> Test Method Used: 0 Pressure D Vacuum k7 Hydrostatic <br /> 0 Other(Sped) <br /> Test Equipment Used: INCON T :-STS Equipment Resolution:,o o o i n. <br /> I'm, 11 "Ilibimis� <br /> Sump# 7 sump ss Sump NSumpp MFAEMM <br /> Sump Diameter: <br /> Sump Depth: '' n <br /> Sump Material: <br /> Height from Tank Top to Top of /D,� +v <br /> Highest Piping Penetration: / <br /> Height from Tank Top to Lowest , <br /> Electrical Penetration: <br /> Condition of sump prior to testing: t= en n G <br /> Portion of Sump Tested' �J <br /> Does turbine shut down when <br /> sump sensor detectsliquid(both es ONo DNA 4Yes ONo DNA DYes ONO DNA OYes ONo DNA <br /> product and water?� <br /> Turbine shutdown response time eG <br /> Is system programmed for fail-safe cs ONo DNA `QYes ONO DNA Dyes ONo DNA DYes ONo DNA <br /> shutdown?' <br /> oasfaonsaafeverifiedtobe 9�Yes ONo DNA Wes ONo DNA DYes ONO DNA OYes DNo DNA <br /> eratiWait time between applying <br /> pressure/vacuum/water and starting <br /> rest: M n <br /> Test Stan Tuae: XFM ', q0T- <br /> InitialReading(R): LI.�7;O .LSb.» 3.Yo6rn 3.40fr;n <br /> Test End Time: :tF4vm 0):VOrtn 07:440nm 01590r- <br /> Final Reading(Rr): 4.hlsb;n 4"�S'b••+ 3,YOfr;0 /ofSin <br /> TestDtuation; ;n ;nOmin <br /> Change in Reading(Rr-N: , 001:» .000�n .Ooosr• • Poo;, <br /> Pais/Fail Threshold or Criteria; , ' ,Q <br /> Test Result: @'Pass 0 Fail .__Pass 0 Fall 0 Pass D Fail 0 Pass 0 Fall <br /> Was sensor removed for testing? es 0No ❑NA es ONo DNA OYes ONo DNA DYes ONo DNA <br /> Was sensor properly replaced and Yes 0 No 0 NA -iiYes ONo DNA 0 Yes 0 No 0 NA OYes ONo (INA <br /> verified functional after testing? <br /> COMMellta-(include information on repairs made prior to re Ing,and recommendedfollow up forfaded rests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire sump must be tested. (See SWRCB L&160) <br />