My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SeP - 2,• 2H3 9:47AM 1S,SERVICES No• 1524 P , 3 <br /> D. Results of Testing/Seniicing (� <br /> Software Version installed: 14. <br /> Com Rte the followinst checklist: <br /> Yes I ❑ No* I Is the audible Ali= tional? <br /> Ycs ❑ No* Is the visual Rimm GP=6021117 <br /> Yes 10 No* Were all sensors visuidly inspected, onally tested,and confirmed operational? <br /> Yes ❑ No' Were all sensors installed m lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper opteation'l <br /> ❑ YesO No' if alarms are relayed to a remote monitoring station. is all communications equipment (e.g. modem) <br /> NIA operational? <br /> Yes 111 Noe For pressurized piping systems,does the turbine automatically shut down if the piping4ceoudary containment <br /> O NIA monitoring system defects a leak,fails m o or is electrically discoaaated? If yes: which sensors aminate <br /> P <br /> shutdown? (Check all Am apply)JW Sensow, ❑D' Coalainmenl$eusers. <br /> Did Zen confirm positive shutdown due to leaks and sensor failureldisconnacttau? Yes; ❑No. <br /> ❑ Yes No' Por tank systems that utilize the monitoring system as the primary task overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> felt iat(s)and o ratio ro l ? use,at whm of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? if yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturername and model for all lacematt in Section L,below. <br /> ❑ Yes' No Was liquid found inside any secondary containment systems designed as dry systema? (Chale all that apply)❑ <br /> Product- ❑Water. if es,describe causes in Section below. <br /> Yes ❑ NO Was momterin a tem w-up reviewed to ean¢e pmpqwhin s?Attach set up reports,if applicable <br /> Yes 10 No* is all monitoring m ent operational per manufacturer's catitms? <br /> *in Section E below,describe how and when these defidcocles were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.