My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 � C SERVICES No • 1624 P . 4 <br /> F. In-Tank Gauging/SIR Equipment: puck this box if tilt gauging is used only for inventory control. <br /> ❑ puck this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the rollowfive ehecklist: <br /> MNo* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • robes visually inspecw for damage and residue buildup? <br /> ❑ No Were all tank gauging p <br /> No* Was accursey of system product level readings tested? <br /> No• Was accuracy of system water level readings tested? <br /> ❑ No* Were all probes reinstalled properly? <br /> k ❑ Yes No• Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In the Section Il.below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followlaE checklist: <br /> YestNor equipment start-up or annual equipment certification, was a leak simulated to verify LLD Performance! <br /> Checkall that apply) Simulated leak rate: IW3g.p.k; 00.1 g.pb; ❑0.2g.p.h. <br /> Yesere all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yesas the resting apparatus properly calibrued7 <br /> YesFor mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ] YesFor electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ YesFor electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut on a any portion of cite monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic ILDs,have sll accessible wiring connections been visually inspected? <br /> N/A <br /> -j Yes M NO Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.