Laserfiche WebLink
SWRCB,January 2002 v Page JR of <br /> 4. SPILIJOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Speck') <br /> Test Method Used: ❑ Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 —87 Spill Box#2—91 Spill Box# Spill Box# <br /> Bucket Diameter. 11" 12" <br /> Bucket Depth: 1 1" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min 10 Mat <br /> starting test: <br /> Test Start Time: 11:33 11:12 <br /> Initial Reading(Rj): 0.000" 0.000" <br /> Test End Time: 11:45 11:24 <br /> Final Reading(RF): 0.000" -5.844" <br /> Test Duration: 12 Min 12 Min <br /> Change in Reading(RF-R[): .000" -5.844„ <br /> Pass/Fail Thresholdor +/-.002" +/-.002" <br /> Criteria: <br /> Test Result: X Pass ❑Fail ❑ Pass X Fail ❑ Pass ❑Fail ❑ Paas ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />