Laserfiche WebLink
SAN T0-AQ,,,,, COUNTY ENVIRONMENTAL HEALTH PARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE I <br /> M01. <br /> TYPE OF ACTION ❑ I.NEW PLAN ❑ 2.CHANGE OF INFORMATION vw <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency(Ise Only) - . <br /> blo3, <br /> FACILITY NA.MECC Y'K-t k.�1ct CC <br /> 1 CITY <br /> FACILITY SITE ADDRESS �`��'1 (o . C f 1Cl'(' -� <br /> II. EQUIPMENT TESTING AND PRE NTIVE'MAINTENANCE <br /> State law requires that testing.preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mob. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. alo- <br /> MONITORING EQUIPMENT IS SERVICED ❑ 1.ANNUALLY ❑ 99-OTHER(Specify):4! ge&f5� <br /> Ili. MONITORING LOCATIONS <br /> This rtwnitonng plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). Byou already have a diagram(e.g.,curtrnt UST Monitoring Site Plan Crom a Monitoring System Certification <br /> form.Hazardous Materials Business Plan ma ,etc. which shows all re aired information,include it with this Ian. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOW MG METH0 (S):(Check all that apply) <br /> Mla. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULTS) tut 1 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> M12. MODEL#: atls. <br /> PANEL MANUFACTURER: <br /> Mw, MODEL#(S): MIs. <br /> LEAK SENSOR MANUFACTURER: <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) vnr <br /> PANEL MANUFACTURER: MIs_ MODEL#: <br /> . <br /> IN-TANK PROBE MANUFACTURER: >ItsMODEL#(S): Mw <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ <br /> It.DAILY/NIGHTLY ❑ c.WEEKLY W,0- <br /> e.OTHER(Specify): x121 <br /> ❑ d.MONTHLY El <br /> M2z. acs. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): <br /> [13.INVENTORY RECONCILIATION [Ia.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2636.1 %124 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS El b.60 HOURS acs_ <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> MJ6. aL'r. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(geyw.e:agency 3pmo.36 M28. <br /> ❑ 99.0THER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) - SIM <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)ITRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> MJt <br /> W2, MODEL#: h133. <br /> PANEL MANUFACTURER: <br /> 1,03. MODEL#(S): ws. <br /> LEAK SENSOR MANUFACTURER: <br /> M6. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> Mar. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED MiahUq. <br /> MLLD MANUFACTURER(s): MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> MODEL#: M31.. <br /> ELLD MANUFACTURER: M40 <br /> PROGRAMMED LME INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. SW <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ It.NO <br /> M4J. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> Mu <br /> ❑ 4.INTEGRITY TESTING <br /> MSS A136 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ It.WEEKLY' ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> •Requires te.,approwl ••Allowed for monitoring ofunWntel emergemy gmmazw fuel piping only per HSC§25231 5(bx3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) 949 <br />