My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO 1990 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/8/2018 9:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2008
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 1990 - 2008 .PDF
QuestysFileName
COMPLIANCE INFO 1990 - 2008
QuestysRecordDate
11/16/2016 9:54:06 PM
QuestysRecordID
3259375
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r %W01 ai <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONII'ORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M50. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: Ms'. MODEL#: N152 <br /> LEAK SENSOR MANUFACTURER: M53. MODEL#(S): ats+. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO N155 <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mw. <br /> WILL FAILURF/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b"NO W7 <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: M58. MODEL#(S): ld59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(R�i.1+ cy app owp Mw <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61_ <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644"1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mso. <br /> I. ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 7/12004) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99.0 OTHER(Specify): MV <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to theirjob duties and can access those documents when needed. <br /> By July 1,2004,this facility will have a"Designated UST Operator'who has passed the operator exam administered by the International Code Council(ICC). By July <br /> 1, 2004, and annually thereafter, the "Designated UST Operator' will train facility employees in the proper operation and maintenance of the UST systems This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> i The facility employee's role with regard to the leak detection equipment. <br /> > The facility employee's role with regard to spills and overfills. <br /> > Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2004,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 7/12004,THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION- <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b), <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CER IFICAT ON: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> E OR SIGNATUREPRER SENTING DATE: Mgr <br /> TIT caner Msc. <br /> ❑Operator ( 0-'1- <br /> OWNE OPERAT R pnn : M9'""- OWNER/OPERATOR TITLE: M93_ <br /> K \'1\ C -l�Yl C r <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.