Laserfiche WebLink
SWRCB,January 2002 Page J of <br /> 7. UNDER-DISPENSER CONTAINMENT DC TESTING <br /> Test Method Developed By: 7 UDC Manufacturer O Industry Standard R Professional Engineer <br /> Other(Spec) <br /> Test Method Used: _ -!Pressure ❑Vacuum ®Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: M-TS A146 ILJSE l.✓ Equipment Resolution: &A0 ri <br /> - UDC# I 2 UDC# 3119 UDC# UDC# 7/9 <br /> UDC Manufacturer: EAi V I/L.o,t/ EA/vt R.oE ✓ AWA) pr AJ <br /> UDC Material: PO[ O c OLy t,O <br /> UDCDepth: 31-f 31q 3 r' <br /> Height from UDC Bottom to Top r <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: S S <br /> Condition of UDC prior to / / <br /> testing: 4 o-a:� 4 00 0 J r <br /> Portion of UDC Tested /Sr' /_Tr' <br /> Does turbine shut down when yes ❑No [INA UDC sensor detects either &Yes ONo ONA D.Yes ONo O NA i Yes O No DNA <br /> product or water? <br /> Turbine shutdown response torte cC Ste- <br /> Is <br /> teIs system programmed for fail- !Yes O No O NA. <br /> safe shutdown? ■Yes ONo ONA ■Yes ONo DNA ■Yes ONo DNA <br /> Was fail-safe verified to be O Yes N No DNA <br /> o rational? O Yes '&No O NA O Yes /No DNA O Yes n No DNA <br /> Wait time between applying .. q n ,1 <br /> ptartin uaJwater and <br /> s test test /0 n1 a 0 / 0 M(A1 /f% JL1 I fr l V <br /> Jiij <br /> Test Start Time: -:/ .d 7 ,'/X ' 3J 3 O <br /> Initial Reading Rt : 100 e 41 ,no01• ,os d • �an . <br /> Test End Time: ,Z / ' 2_7 14K /6 :492- <br /> Final <br /> ZFinal Reading . 04,1, •• 0 .0004 .ouo" io •ooa .. <br /> Test Duration: 12 M ti./ /2 AAAI IZA1 rAJ 2 rti <br /> Change in - " 0 ' 0001, . UOJ'• r 000 N <br /> Pass/Fail Threshold orCriteria; . . 00Zrt f 00 2.' .17 oolf <br /> Text Result: D Pau ❑Fail D Pau O Fall ■ Pass O F&H ■ Pau O Fail <br /> Was sensor removed forteslmg? DYes ONo 0 N DYes ONo ONA wYes ONo ONA *Yes ONo DNA <br /> Was sensor properly replaced and DYes, ONo DNA =Yes ONo ❑NA tYes ON, DNA *Yes ONo DNA <br /> verified functional after <br /> Comments—(include information on repairs made prior to nesting,and recommendedfollow-up for fled tests) <br /> ' If the testing method does not test the entire depth of the UDC,specify how much of the UDC was tested. Methods not testing the <br /> entire UDC should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LG-160) <br /> 'With the submersible pump running,place the sensor in product(discriminating sensors should also be placed in water). The time <br /> between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br /> containment testing method used does not test the entire volume of the UDC <br /> This information is not needed if the entire UDC is tested. <br />