Laserfiche WebLink
Jan 27 16 11:56a JP Petroleum Service P163724873 <br /> P.3 <br /> S'A RCB.3anuary 2002 <br /> Page of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer J Industry Standard J Professional Engineer- <br /> C1 Other(Specify) <br /> Test Method Used: X Pressure J Vacuum <br /> ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge <br /> � LquI�ment Rcsoiution: 0-15 ASI <br /> Piping Run 9 1 Piping Run #►2 Piping Run #3 Piping Run f # <br /> Piping Material: pol �- - --- <br /> Y Poly PaIY Poly <br /> Piping Manufacturer: Environ Environ Environ Environ <br /> Piping Diameter- 2" 21, 7„ <br /> Length of Piping Run: 160' 120' 120' — 160' <br /> Product Stored: Regular(north) Regular(south) Premium (north) Premium(south) <br /> Method and location of <br /> -piping-run isolation: Test hoot Test boot Test boat Test boot <br /> Wait time between WP-1—yin.- <br /> pressure/vacuum/water <br /> pplyingpressurelvacuum/wdter and 5 min 5 min 5min 5 min <br /> starting test <br /> Test Start Time: 8:45 8:45 8:45 <br /> Initial Reading(Ri): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 9:45 9:45 9:45 <br /> Final Reading(RF): 5 PSI 5 PSi 5 PSI <br /> Test Duration: I Hour 1 Hour 1 Hour I Hour <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: 0 drop 0 drop 0 drop 0 drop <br /> Test Result: D Pass ©Fail x Pass E] Fail x Pass ❑Fail x Pass 0Fai! <br /> COMMelltS — (include i ormation on re rrr made priLar to testrn , and recommended failow-up for failed tests) <br /> Test penetration on re lar line on side I1 has tear in boot unable to test line. <br /> AR 0 <br />