My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 9:47:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 2016 - PRESENT.pdf
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/18/2016 5:11:43 PM
QuestysRecordID
3261353
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 27 16 11 56a JP Petroleum Service <br /> 0153724873 p.4 <br /> SWRCB,January 2002 Pagc of <br /> 6. PEPING SUMP TESTING <br /> FT <br /> thod Developed By: E Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> C Other(Spec) <br /> hod Used: C Pressure ❑ Vacuum X Hydrostatic <br /> ❑Other(spec) <br /> ipment Used: Caldwell Systems — Equipment Resolution: .005r;0 min <br /> Sump# i �42" <br /> 2 Samp## _ Samp q <br /> Sump Diameter: 42" <br /> Sump Depth: 46" 48" <br /> Sump Material: Fiberglass i Fiberglass <br /> Height from Tank Top to Top of <br /> Hiahest P' in Penetration: 21 23" <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 23" 21" <br /> Condition of sump prior to testing: Dry Dr, <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(bath x Yes ❑No C NA x Yes ❑No ❑NA C Yes ---No ❑NA ❑Yes C No ❑NA <br /> product and water ?' <br /> Turbine shutdown response time <br /> Is system programmed for Fail-safe <br /> shutdown? x Yes Ll No 11 NA x Yes No ❑NA Yes ❑No ❑NA n Yes C No ❑NA <br /> Was fail-safe verified to be <br /> _0P erational?' ❑Yes x No 0 NA Ci Yes x No ❑NA n Yes ❑No I:i NA C Yes C No Q NA <br /> Wait time between applying <br /> pressure.vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 9:25 9:15 <br /> Wtiai Reading(Rl): ,00" ,00" UO" .00" <br /> Test End Time: 9:55 9:45 <br /> Final Reading(Rr): .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R,): 00 .00 <br /> Pass/Fail Threshold or Criteria: 045130 min .005/30 min .005/30 rain .005/30 min <br /> Test Result: D Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail 0 Pass 13 Fail <br /> Was sensor removed for testing? x Yes :)No DNA x Yes :]No CNA x Yes ❑No CNA ❑Yes ❑No ❑NA <br /> Was sewproperly replaced and <br /> verified functional after testing? x Yes ❑No n NA x Yes 11No F1NA x Yes ❑No ElNA C Yes ❑No CNA <br /> Commeints—(include information on repairs made prior to restin, and recommended foll(nv-up for failed tests) <br /> V1 ber <br /> 2016 <br /> H. <br /> If the entire depth of the sump is not tested,specify bow much was tested. If the answer to�of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See S WRCS LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.