Laserfiche WebLink
Jan 27 16 11 56a JP Petroleum Service <br /> 0153724873 p.4 <br /> SWRCB,January 2002 Pagc of <br /> 6. PEPING SUMP TESTING <br /> FT <br /> thod Developed By: E Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> C Other(Spec) <br /> hod Used: C Pressure ❑ Vacuum X Hydrostatic <br /> ❑Other(spec) <br /> ipment Used: Caldwell Systems — Equipment Resolution: .005r;0 min <br /> Sump# i �42" <br /> 2 Samp## _ Samp q <br /> Sump Diameter: 42" <br /> Sump Depth: 46" 48" <br /> Sump Material: Fiberglass i Fiberglass <br /> Height from Tank Top to Top of <br /> Hiahest P' in Penetration: 21 23" <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 23" 21" <br /> Condition of sump prior to testing: Dry Dr, <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(bath x Yes ❑No C NA x Yes ❑No ❑NA C Yes ---No ❑NA ❑Yes C No ❑NA <br /> product and water ?' <br /> Turbine shutdown response time <br /> Is system programmed for Fail-safe <br /> shutdown? x Yes Ll No 11 NA x Yes No ❑NA Yes ❑No ❑NA n Yes C No ❑NA <br /> Was fail-safe verified to be <br /> _0P erational?' ❑Yes x No 0 NA Ci Yes x No ❑NA n Yes ❑No I:i NA C Yes C No Q NA <br /> Wait time between applying <br /> pressure.vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 9:25 9:15 <br /> Wtiai Reading(Rl): ,00" ,00" UO" .00" <br /> Test End Time: 9:55 9:45 <br /> Final Reading(Rr): .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R,): 00 .00 <br /> Pass/Fail Threshold or Criteria: 045130 min .005/30 min .005/30 rain .005/30 min <br /> Test Result: D Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail 0 Pass 13 Fail <br /> Was sensor removed for testing? x Yes :)No DNA x Yes :]No CNA x Yes ❑No CNA ❑Yes ❑No ❑NA <br /> Was sewproperly replaced and <br /> verified functional after testing? x Yes ❑No n NA x Yes 11No F1NA x Yes ❑No ElNA C Yes ❑No CNA <br /> Commeints—(include information on repairs made prior to restin, and recommended foll(nv-up for failed tests) <br /> V1 ber <br /> 2016 <br /> H. <br /> If the entire depth of the sump is not tested,specify bow much was tested. If the answer to�of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See S WRCS LG-160) <br />