Laserfiche WebLink
Jan 27 16 11:56a JP Petroleum Service a,63724873 <br /> p.5 <br /> 1W IWW <br /> SWRCB, January 2002 Page of <br /> 7- UNDER-DISPENSER CONTAINMENT CTESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑ Industry Standard X Professional Fngincer <br /> ❑Other(Sped) <br /> `Fest Method Uscd: ❑ Pressurc ❑Vacuum X Hydrostatic <br /> ❑Other(Specif) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution 005/30 min <br /> UDC#11-2 UDC#�3-4 UDC#5-6 L_DC#7-8 <br /> UDC Manufacturer: Environ Environ Environ Environ <br /> UDC Material: Poly Poly Poly Poly <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top $° 8„ $r 7„ <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 4" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry pry Dry <br /> testin : <br /> Portfan of UDC Tested =2!'above Highest Piping Penetration <br /> Does turbine shut down whenUDC sensor detects liquid(both x Yes L Na ❑NA x Yes J No C NA x Yes Cl No J NA <br /> 2` duct d water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* xYes ❑No ❑NA x Yes L No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> o rational?* F� Yes x No ❑NA ❑Yes x No ❑NA i G Yes x No 0 NA D Yes x No ❑NA <br /> Wait time between applying <br /> pressur,elvacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 12:40 12:30 11:1 <br /> Initial Readin P A- .00" 00" <br /> Fest End Time: I:10 1:00 11:40 <br /> Final Readin (RF): .00 .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading (Rr-Rj): .00 .00 .00 <br /> Pass/Fail Threshold or Criteria: .005130 min .005130 min 005130 min .005/30 min <br /> Test Result: x Pass 0 Fail x Pass ❑ Fail ❑ Pass x Fail x Pass ❑Fait <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes U No ❑NA x Yes ❑No ❑NA x Yes ❑No CNA <br /> Was sensor properly replaced and x Yes C No 7 NA x Yes ❑No NA x Yes ❑No ❑NA x Yes ❑No CNA <br /> verified fimetionai after testing? <br /> Comments—(inerude in orrnW on on repairs made prior to testing, and recommended fallaw-up for aiied tests) <br /> UDC 5-6 has torn penetration fitting at surnp wall <br /> "RR atnixl"r) <br /> U R 08 2016 <br /> VIRONh NTAi <br /> ITSI rWP4gTMFNT <br /> If the entire depot of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire UDC mast be tested. (Sec SR'RCB LG-]6D) <br />