My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
COMPLIANCE INFO 2001-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/8/2018 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2006
RECORD_ID
PR0516736
PE
2361
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2802 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\COUNTRY CLUB\2802\PR0516736\COMPLIANCE INFO 2001-2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation and Maintenance Manual <br /> CNI Manufacturing Phase I Vapor Recovery System (D Page 26 of 28 <br /> Figure F-1 <br /> Husky Model 4885 2-Inch Threaded Pressure/Vacuum Vent Valve <br /> PRESSURE/VACUUM VENT MODEL 4885 <br /> INSTALLATION AND MAINTENANCE PRESSURE VACUUM VENT WARRANTY <br /> INSTRUCTIONS INFORMATION <br /> INSTALLATION Husky Corporation will, at its option, repair, replace, or <br /> The PN Vent is designed to fit on top of a 2"vent pipe. credit the purchase price of any Husky manufactured <br /> Remove the PN Vent from the carton and visually inspect Pressure Vacuum Vent which proves upon examination by <br /> for any shipping damage. Husky, to be defective in material and/or workmanship <br /> within EIGHTEEN (18) MONTHS from the date of <br /> S<¢FW5 shipment for any Husky Pressure Vacuum Vent, except as <br /> otherwise provided herein.For all other Husky manufactured <br /> product, see Husky Form No. PS2002-Term (4/15/02) at <br /> www.husky.com. <br /> (� The warranty period on repaired or replacement product is <br /> only for the remainder of the warranty period. Buyer must <br /> return the products to Husky,transportation charges prepaid. <br /> This Warranty does not apply to equipment or parts which <br /> have been installed improperly, damaged by misuse, <br /> improper operation or maintenance, or which are altered or <br /> repaired in any way other than by Husky. <br /> The Warranty provisions contained herein apply ONLY to <br /> original purchasers and subsequent commercial purchasers <br /> within the warranty period who use the equipment for <br /> commercial or industrial purposes. THERE ARE NO <br /> Model 4885 Thread-On PN Vent OTHER WARRANTIES OF MERCHANTABILITY, <br /> Apply fuel resistant pipe sealant to the threads on the 2"vent FITNESS FOR A PARTICULAR PURPOSE, OR <br /> stack. Screw the PN Vent onto the vent stack and tighten to a OTHERWISE, AND ANY OTHER SUCH WARRANTIES <br /> range of 20 to 50 ft-lbs with a suitable wrench. DO NOT ARE HEREBY SPECIFICALLY DISCLAIMED. <br /> OVER-TIGHTEN.Periodic maintenance is recommended(see Husky assumes NO LIABILITY for labor charges or <br /> other costs incurred by Buyer incidental to the service, <br /> below). adjustment, repair, return, removal or replacement of <br /> products. HUSKY ASSUMES NO LIABILITY FOR ANY <br /> MAINTENANCE INCIDENTAL, CONSEQUENTIAL, OR OTHER <br /> Annually inspect the PN Vent valve for foreign objects without DAMAGES UNDER ANY WARRANTY, EXPRESS OR <br /> removing the PN Vent valve from the vent pipe by using the IMPLIED, AND ALL SUCH LIABILTY IS HEREBY <br /> following procedure: EXPRESSLY EXCLUDED. <br /> I. Remove the screws that hold the top cover on. Husky reserves the right to change or improve the design <br /> 2. Remove any debris that might be sitting inside the lower of any Husky fuel dispensing equipment without assuming <br /> cover. any obligations to modify any fuel dispensing equipment <br /> 3. Check the drain holes in the lower cover for blockage. previously manufactured. <br /> 4. The two(2)screens should not be removed. <br /> 5. Reinstall the top cover and retaining screws. ,.• � �; <br /> 6. Tighten the screws firmly. <br /> N <br /> NOTE:DO NOT ALTER OR COVER THE PN VENT �V/'���'�►►x//11 <br /> TESTING CRITERIA <br /> Leak rate:Pressure=.05 CFH at 2"WC, <br /> Vacuum=.21 CFH at 4"WC. HUSKY CORPORATION • 2325 HUSKY WAY • <br /> rn�..Ws... Cracking Pressure:2%"to 3%"WC, PACIFIC,MO 63069 <br /> Vacuum=.6"to-10"WC. tnmv.husky.com PHONE: 800-325-3558 <br /> Per ARB procedure TP-201.1E or the applicable 009063—0 6/5/02 <br /> ARB Executive Order. <br /> HUSKY CORPORATION • 2325 HUSKY WAY • PACIFIC, <br /> MO 63069 <br /> w hushy.rom PHONE: 800-325-3558 009041-5 6/5/02 <br /> (REVERSE SIDE IS 009063)009041-4 12/10/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.