My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2005 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:48:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2010
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2005 - 2010 .PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2010
QuestysRecordDate
5/17/2017 6:13:49 PM
QuestysRecordID
3384372
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monit-ring System Certification • • <br /> Site Address: Date of Testing/Seryicing: <br /> F. In-Tank Gauging/SIR Equipment: heck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section]rust be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's[maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co tete the following checklist: - <br /> Yes ❑ No* For equipment start-up or annual equipment cc tfication, was a leak simulated to verify LLD performance? - <br /> ❑ N/A (Check all that apply) Simulated leak rate: ;�3 g.p.h.; ❑ 0.1 g.p.h ; ❑02 g.p.h. <br /> es ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? _ <br /> Yes ❑ No* Was the testing apparatus properly calibrated? - <br /> Jd Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? _ <br /> ❑ N/A <br /> ❑ Yes ❑ * For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑jNo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled: <br /> ,6 N/A or disconnected? <br /> ❑ yes ❑ o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test? <br /> ❑ Yes ❑ o* For electronic LCDs,have all accessible wiring connections been visually inspected? <br /> C1 N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> • In the Section H,below,describe how and when these deficiencies were or will be corrected. - <br /> H. Comments: <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.