Laserfiche WebLink
D. Results of Testing/Servicli <br /> Software version Installed: <br /> Complete the following checklist: <br /> es Rnot <br /> Is the auFsensors <br /> operational? <br /> es Is the vierational? <br /> Yes Were allally inspected, functionally tested, and confirmed operational? <br /> Were allalled at lowest point of secondary containment and positioned so that other equipment will <br /> interir proper operation? <br /> ❑ Yes If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> p%p operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to opera rTs electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) L(Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; Q'90. <br /> ❑ Yes ❑ 1�0* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention.valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes, describe causes in Section E,below. <br /> El Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br />