Laserfiche WebLink
. .�•o+.gv�oicm a.crulicalloo <br /> Mo ra���,ev(on , <br /> Site Address: f ' t 0�l + p / ��/ � ' <br /> a� � a<<i � Ff7�" '� , 1I tea �9 <br /> � V a of'I'esting/Servicing: <br /> K In-Tank Gauging/SIR Equipment: � this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-lank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ Now Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ Now Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ Now Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ Now Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ Now Were all probes reinstalled properly? <br /> ❑ Yes ❑ Now Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe now and when these deficiencies were ur w111 be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ITYes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑g p.h.; ❑ 0.1 g.p.h ; L30.2 g.p.h. <br /> Q Yes ❑ Now Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> 3—Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Now For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑-NA <br /> ❑ Yes ❑ No* For electronic LLDs, does fhe turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> l NIA malfunctions or fails a test? <br /> ❑ Yes ❑ NO For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> U N/A <br /> U Yes ❑ Now Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />