My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:48:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
5/17/2017 4:28:22 PM
QuestysRecordID
3383804
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer )Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: !Pressure Vacuum "'Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> jNNNNNPiping Run#87 Piping Run#91 n Piping Run#91s Piping Run#diesel <br /> Piping Material: fiberglass fiberglass fiberglass fiberglass <br /> Piping Manufacturer: amron amron amron amron <br /> Piping Diameter: 3.50" 3.50" 3.50" 3.50" <br /> Length of Piping Run: 125' 125' 125' 60' <br /> Product Stored: gasoline gasoline gasoline diesel <br /> Method and location of clam shell in sump clam shell in sump clam shell in sump clam shell in sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 10:00am 10:15am 10:15am 9:45am <br /> Initial Reading(RI): 5.00" 5.00" 5.00" 5.00" <br /> Test End Time: 11:00am 11:15am 11:15am 10:45am <br /> Final Reading(RA 5.00" 5.00" 5.00" 5.00" <br /> Test Duration: 60 minutes 60 minutes 60 minutes 60 minutes <br /> Change in Reading(Rr-RI): 0.00" 0.00" 0.00" 0.00" <br /> Pass/Fail Threshold or <br /> 0.00" 0.00" 0.001, 0.00" <br /> Criteria: <br /> Test Result: Z Pass L!Fail 2 Pass L Fail k Pass Ll Fail 2, Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follotiv-u for failed tests) <br /> had to Install 1 t4"plugs at bottom of clam shells in 87,91n&91s to seal off air.there are Schrader style valves at the top of the clam shells to be able to <br /> In.-tall air rhi irks fnr tastinn <br />
The URL can be used to link to this page
Your browser does not support the video tag.