Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer )Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: !Pressure Vacuum "'Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> jNNNNNPiping Run#87 Piping Run#91 n Piping Run#91s Piping Run#diesel <br /> Piping Material: fiberglass fiberglass fiberglass fiberglass <br /> Piping Manufacturer: amron amron amron amron <br /> Piping Diameter: 3.50" 3.50" 3.50" 3.50" <br /> Length of Piping Run: 125' 125' 125' 60' <br /> Product Stored: gasoline gasoline gasoline diesel <br /> Method and location of clam shell in sump clam shell in sump clam shell in sump clam shell in sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 10:00am 10:15am 10:15am 9:45am <br /> Initial Reading(RI): 5.00" 5.00" 5.00" 5.00" <br /> Test End Time: 11:00am 11:15am 11:15am 10:45am <br /> Final Reading(RA 5.00" 5.00" 5.00" 5.00" <br /> Test Duration: 60 minutes 60 minutes 60 minutes 60 minutes <br /> Change in Reading(Rr-RI): 0.00" 0.00" 0.00" 0.00" <br /> Pass/Fail Threshold or <br /> 0.00" 0.00" 0.001, 0.00" <br /> Criteria: <br /> Test Result: Z Pass L!Fail 2 Pass L Fail k Pass Ll Fail 2, Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follotiv-u for failed tests) <br /> had to Install 1 t4"plugs at bottom of clam shells in 87,91n&91s to seal off air.there are Schrader style valves at the top of the clam shells to be able to <br /> In.-tall air rhi irks fnr tastinn <br />