My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
11/8/2018 9:48:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
5/17/2017 4:28:22 PM
QuestysRecordID
3383804
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: _ Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:INCON Equipment Resolution: <br /> Sump#$7 lsump#91n Sump#91 S Sump#diesel <br /> Sump Diameter: 48.00" 48.00" 48.00" 48.00" <br /> Sump Depth: 55.00" 57.00" 60.00" 62.00 <br /> Sump Material: fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of <br /> 14.00" 14.00" 14.00" 14.00" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 12.00" 12.00" 12.00" 12.00" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: clean clean clean clean <br /> Portion of Sump Tested' 18.00" 18.00" 18.00" 18.00" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA <br /> Yes No v NA Yes No Z NA Yes No v NA <br /> product and water)?* <br /> Turbine shutdown response time n/a n/a n/a n/a <br /> Is system programmed for fail-safe Yes ❑No 0 NA Yes No NA Yes No -7 NA ❑Yes Ll No v NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes i❑No iJ NA Yes No NA Yes No 17 NA ❑Yes ❑No v NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: Please See ancon results <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: V1 Pass -. Fail Z Pass Fail Z. Pass Fail Pass Fail <br /> Was sensor removed for testing? ' Yes ❑No NA LI Yes ❑No NA , Yes ❑No NA Yes ❑No 'u NA <br /> Was sensor properly replaced and ?Yes ❑No a NA ;;,i Yes ❑No NA Yes ❑No NA 0 Yes []No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to as of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.